Experimental study on flocculation-accelerated deposition of dredger fill
Artículo
Acceso abierto
Artículo
DOAJ
After hydraulic reclamation of the dredger fill, the mud needs some time to deposit. The reinforcement treatment cannot be carried out until the sludge-water separation is completed and the separated water is drained. Th...
LCC LCC:Engineering geology. Rock mechanics. Soil mechanics. Underground constructionIdioma eng
Acceso abiertoRuta libre sin proxy. Acceso recomendado cuando no hay suscripción activa.
Open Access