Torna ai risultati
Scheda bibliografica · Consultazione e accesso
Artículo

Optimization of key operational parameters in a pyrite driven mixotrophic denitrification system

XU Huanghuan et al · Editorial Office of Industrial Water Treatment · 2026

Accesso aperto disponibile
Lettura rapida. Controlla i dati essenziali della risorsa e accedi al contenuto con il pulsante principale. La scheda mostra solo le informazioni necessarie per identificare, citare e aprire l’opera.

Accesso alla risorsa

Apri il contenuto dall’opzione principale o scegli un’altra fonte disponibile.

DOAJ DOAJ Articles
Entrar por DOAJ
Accesso principale

Accesso aperto disponibile

Recurso identificado como acceso abierto, sin confirmar automáticamente si es texto completo directo.
Apri risorsa

Riepilogo

Descripción general del contenido del recurso.

With the intensification of water eutrophication, traditional nitrogen and phosphorus removal processes face challenges such as low efficiency and high cost under low-carbon conditions. In this study, a pyrite driven mixotrophic denitrification(PMD) system was constructed in batch reactors. The effects of pyrite dosage, C/N ratio,pH and temperature on nitrogen and phosphorus removal were systematically investigated. Results showed that optimal performance was achieved at pyrite dosage of 60-150 g/L and C/N ratio of 3, with total nitrogen(TN) and total phosphorus(TP) removal rates reaching 91.73% and 99.85%, respectively. Excessive pyrite addition induced passivation and nitrite accumulation, inhibiting denitrification, while overly high C/N ratios suppressed autotrophic denitrification and reduced phosphorus removal. Neutral pH(pH=7) and moderate temperatures(25-35 ℃) provided the best synergistic performance. Acidic conditions inhibited enzyme activity and induced sludge hydrolysis, whereas alkaline conditions hindered electron transfer and triggered dissimilatory nitrate reduction. Low temperatures reduced enzymatic activity, while high temperatures damaged enzyme stability, both leading to efficiency loss. Sludge analysis revealed that increased pyrite raised sludge concentration but excessive dosage caused inorganic accumulation,reducing mass transfer and system stability. This study clarified key operational parameters for PMD and provided theoretical support for its engineering application in simultaneous nitrogen and phosphorus removal.

Come citare

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

al, X. H. E. (2026). Optimization of key operational parameters in a pyrite driven mixotrophic denitrification system. https://doi.org/10.19965/j.cnki.iwt.2025-0430

MLA

al, XU Huanghuan et. "Optimization of key operational parameters in a pyrite driven mixotrophic denitrification system." 2026. https://doi.org/10.19965/j.cnki.iwt.2025-0430.

Chicago

al, XU Huanghuan et. 2026. "Optimization of key operational parameters in a pyrite driven mixotrophic denitrification system.". https://doi.org/10.19965/j.cnki.iwt.2025-0430.

Harvard

al, X. H. E. 2026, Optimization of key operational parameters in a pyrite driven mixotrophic denitrification system, Editorial Office of Industrial Water Treatment, available at: https://doi.org/10.19965/j.cnki.iwt.2025-0430 [Accessed 10 Aug. 2026].

Condividi e stampa

Salva la scheda, copia il link permanente o stampala in PDF.

Esporta riferimento

Esporta il record nei formati più comuni per usarlo con un gestore bibliografico.

Dettagli della risorsa

Informazioni bibliografiche utili per verificare che sia il materiale corretto.

Titolo
Optimization of key operational parameters in a pyrite driven mixotrophic denitrification system
Autore / collaboratori
XU Huanghuan et al
Editore
Editorial Office of Industrial Water Treatment
Anno di pubblicazione
2026
ISSN
1005-829X
ISSN
1005-829X
Lingua
zho

Soggetti

Esplora risorse correlate a partire da questi soggetti.

Copiato