Voltar aos resultados
Registro bibliográfico · Consulta e acesso
Artículo

Assessment of cost and schedule performance in construction of key nuclear reactors

Кароль Скіба et al · Kyiv National University of Construction and Architecture · 2025

Texto completo em acesso aberto
Leitura rápida. Confira os dados básicos do recurso e acesse o conteúdo pelo botão principal. Esta ficha mostra apenas as informações necessárias para identificar, citar e abrir a obra.

Acesso ao recurso

Acesse o conteúdo pela opção principal ou escolha outra fonte disponível.

DOAJ DOAJ Articles
Entrar por DOAJ
Acesso principal

Texto completo em acesso aberto

Texto completo identificado como acceso abierto.
Abrir texto

Resumo

Descripción general del contenido del recurso.

The nuclear industry is a unique sector that is especially vulnerable to delays. A multitude of impactful factors such as the complexity of design, tight on-site schedules, and a logistically sophisticated end-to-end supply chain, to name just a few, make the entire project highly prone to complications. In 2017, it was estimated that nearly two-thirds of the 55 nuclear plants under construction at that time were behind schedule. Furthermore, since 2010, delays of this nature have been believed to have contributed to an almost 20% increase in the final costs of the projects. This work analyzed recent construction performance of Generation III/III+ nuclear reactor projects, specifically examining AP1000, EPR, and APR1400 technologies. Key performance indicators evaluated included planned versus actual construction times, costs, and capacity construction rates, revealing significant deviations across the analyzed projects. Each nuclear project's performance was quantitatively assessed using the schedule performance ratio, cost performance ratio, and an integrated performance coefficient to comprehensively compare efficiencies across different reactor technologies. Analysis further identified key reasons behind these deviations, such as evolving regulatory environments, safety requirements, project management inefficiencies, supply chain immaturity, and limited skilled workforce availability, which contributed to persistent first of a kind (FOAK) challenges and obscured the anticipated nth of a kind (NOAK) improvements. Based on these findings, recommendations are provided for future research, emphasizing the necessity to apply insights gained from large reactor deployment challenges to the emerging Small Modular Reactor (SMR) technologies.

Como citar

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

al, К. С. E. (2025). Assessment of cost and schedule performance in construction of key nuclear reactors. https://doi.org/10.32347/2522-4182.16.2025.5-21

MLA

al, Кароль Скіба et. "Assessment of cost and schedule performance in construction of key nuclear reactors." 2025. https://doi.org/10.32347/2522-4182.16.2025.5-21.

Chicago

al, Кароль Скіба et. 2025. "Assessment of cost and schedule performance in construction of key nuclear reactors.". https://doi.org/10.32347/2522-4182.16.2025.5-21.

Harvard

al, К. С. E. 2025, Assessment of cost and schedule performance in construction of key nuclear reactors, Kyiv National University of Construction and Architecture, available at: https://doi.org/10.32347/2522-4182.16.2025.5-21 [Accessed 7 Aug. 2026].

Compartilhar e imprimir

Salve a ficha, copie o link permanente ou imprima em PDF.

Exportar referência

Exporte o registro nos formatos mais comuns para usar em um gerenciador bibliográfico.

Detalhes do recurso

Informações bibliográficas para confirmar que este é o material correto.

Título
Assessment of cost and schedule performance in construction of key nuclear reactors
Autor / colaboradores
Кароль Скіба et al
Editora
Kyiv National University of Construction and Architecture
Ano de publicação
2025
ISSN
2522-4182
ISSN
2522-4182
Idioma
Inglés

Assuntos

Explore recursos relacionados a partir destes assuntos.

Copiado