Torna ai risultati
Scheda bibliografica · Consultazione e accesso
Artículo

Inter-row delay time optimization and vibration control in blasting caving of insulating pillar based on the HJC constitutive model

FEI Honglu et al · Emergency Management Press · 2026

Accesso aperto disponibile
Lettura rapida. Controlla i dati essenziali della risorsa e accedi al contenuto con il pulsante principale. La scheda mostra solo le informazioni necessarie per identificare, citare e aprire l’opera.

Accesso alla risorsa

Apri il contenuto dall’opzione principale o scegli un’altra fonte disponibile.

DOAJ DOAJ Articles
Entrar por DOAJ
Accesso principale

Accesso aperto disponibile

Recurso identificado como acceso abierto, sin confirmar automáticamente si es texto completo directo.
Apri risorsa

Riepilogo

Descripción general del contenido del recurso.

When using the blasting caving method to treat goaf, the collapsing ore and rock can cause shock disturbances to the roof of the lower stope, which may lead to stability risks. This study takes the goaf treatment project of Baiyinnuoer No.1 ore body for analysis to protect the stability of the lower stope roof. Specifically, HJC constitutive parameters were calibrated using the physical and mechanical parameters of the ore and rock; SHPB tests were conducted to investigate the dynamic constitutive behavior of the ore and rock, and the reliability of the HJC constitutive model was verified through simulation results. Using LS-DYNA and HJC constitutive parameters, the inter-row delay time was simulated and optimized for insulating pillar blasting caving. Results show that under low impact air pressure, the dynamic stress-strain curves of both types of ore exhibit hysteresis effects. At identical impact pressure, the insulating pillar specimen shows limited damage, while the ore in the lower stope roof experiences more severe fragmentation. In the simulation under different inter-row delay times, the 100 ms working condition yields significant stress superposition effect, extensive disintegration of the insulating pillar, through-going cracks at the top, and failed unit of 998 m3. The collapsed insulating pillar after blasting forms an effective buffer layer in the goaf, isolating the open-pit mine from the underground space, and preventing the instability of the lower stope roof caused by shock disturbances. The peak particle velocity at the tunnel blasting vibration measurement point was 0.64 cm/s, much lower than the allowable lower limit of 15.0 cm/s.

Come citare

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

al, F. H. E. (2026). Inter-row delay time optimization and vibration control in blasting caving of insulating pillar based on the HJC constitutive model. https://doi.org/10.19606/j.cnki.jmst.2026003

MLA

al, FEI Honglu et. "Inter-row delay time optimization and vibration control in blasting caving of insulating pillar based on the HJC constitutive model." 2026. https://doi.org/10.19606/j.cnki.jmst.2026003.

Chicago

al, FEI Honglu et. 2026. "Inter-row delay time optimization and vibration control in blasting caving of insulating pillar based on the HJC constitutive model.". https://doi.org/10.19606/j.cnki.jmst.2026003.

Harvard

al, F. H. E. 2026, Inter-row delay time optimization and vibration control in blasting caving of insulating pillar based on the HJC constitutive model, Emergency Management Press, available at: https://doi.org/10.19606/j.cnki.jmst.2026003 [Accessed 8 Aug. 2026].

Condividi e stampa

Salva la scheda, copia il link permanente o stampala in PDF.

Esporta riferimento

Esporta il record nei formati più comuni per usarlo con un gestore bibliografico.

Dettagli della risorsa

Informazioni bibliografiche utili per verificare che sia il materiale corretto.

Titolo
Inter-row delay time optimization and vibration control in blasting caving of insulating pillar based on the HJC constitutive model
Autore / collaboratori
FEI Honglu et al
Editore
Emergency Management Press
Anno di pubblicazione
2026
ISSN
2096-2193
ISSN
2096-2193
Lingua
Inglés

Soggetti

Esplora risorse correlate a partire da questi soggetti.

Copiato