Mechanism and experimental study of roof pre-splitting blasting for automated roadway formation without coal pillars
KANG Xuhui et al · Emergency Management Press · 2026
Acceso al recurso
Entrá al contenido desde la opción principal o elegí otra fuente disponible.
Acceso abierto disponible
Resumen
Descripción general del contenido del recurso.
Cómo citar
Elegí el formato que necesitás y copiá la referencia al portapapeles.
APA 7
al, K. X. E. (2026). Mechanism and experimental study of roof pre-splitting blasting for automated roadway formation without coal pillars. https://doi.org/10.19606/j.cnki.jmst.2026020
MLA
al, KANG Xuhui et. "Mechanism and experimental study of roof pre-splitting blasting for automated roadway formation without coal pillars." 2026. https://doi.org/10.19606/j.cnki.jmst.2026020.
Chicago
al, KANG Xuhui et. 2026. "Mechanism and experimental study of roof pre-splitting blasting for automated roadway formation without coal pillars.". https://doi.org/10.19606/j.cnki.jmst.2026020.
Harvard
al, K. X. E. 2026, Mechanism and experimental study of roof pre-splitting blasting for automated roadway formation without coal pillars, Emergency Management Press, available at: https://doi.org/10.19606/j.cnki.jmst.2026020 [Accessed 28 Jun. 2026].
Detalles del recurso
Información bibliográfica útil para confirmar que se trata del material correcto.
- Título
- Mechanism and experimental study of roof pre-splitting blasting for automated roadway formation without coal pillars
- Autor / colaboradores
- KANG Xuhui et al
- Editorial
- Emergency Management Press
- Año de publicación
- 2026
- ISSN
- 2096-2193
- ISSN
- 2096-2193
- Idioma
- eng
Materias
Explorá otros recursos relacionados a partir de estas materias.