Research on integrated energy coupling optimization operation method of industrial park based on novel power system
DUAN Meimei et al · Harbin Jinhe Electrical Measurement & Instrumentation Magazine Publishing Co., Ltd · 2026
Acceso al recurso
Entrá al contenido desde la opción principal o elegí otra fuente disponible.
Material complementario disponible
Resumen
Descripción general del contenido del recurso.
Cómo citar
Elegí el formato que necesitás y copiá la referencia al portapapeles.
APA 7
al, D. M. E. (2026). Research on integrated energy coupling optimization operation method of industrial park based on novel power system. https://doi.org/10.19753/j.issn1001-1390.2026.03.004
MLA
al, DUAN Meimei et. "Research on integrated energy coupling optimization operation method of industrial park based on novel power system." 2026. https://doi.org/10.19753/j.issn1001-1390.2026.03.004.
Chicago
al, DUAN Meimei et. 2026. "Research on integrated energy coupling optimization operation method of industrial park based on novel power system.". https://doi.org/10.19753/j.issn1001-1390.2026.03.004.
Harvard
al, D. M. E. 2026, Research on integrated energy coupling optimization operation method of industrial park based on novel power system, Harbin Jinhe Electrical Measurement & Instrumentation Magazine Publishing Co, Ltd, available at: https://doi.org/10.19753/j.issn1001-1390.2026.03.004 [Accessed 28 Jun. 2026].
Detalles del recurso
Información bibliográfica útil para confirmar que se trata del material correcto.
- Título
- Research on integrated energy coupling optimization operation method of industrial park based on novel power system
- Autor / colaboradores
- DUAN Meimei et al
- Editorial
- Harbin Jinhe Electrical Measurement & Instrumentation Magazine Publishing Co., Ltd
- Año de publicación
- 2026
- ISSN
- 1001-1390
- ISSN
- 1001-1390
- Idioma
- zho
Materias
Explorá otros recursos relacionados a partir de estas materias.