Research on integrated energy coupling optimization operation method of industrial park based on novel power system
DUAN Meimei et al · Harbin Jinhe Electrical Measurement & Instrumentation Magazine Publishing Co., Ltd · 2026
Accesso alla risorsa
Apri il contenuto dall’opzione principale o scegli un’altra fonte disponibile.
Materiale supplementare disponibile
Riepilogo
Descripción general del contenido del recurso.
Come citare
Elegí el formato que necesitás y copiá la referencia al portapapeles.
APA 7
al, D. M. E. (2026). Research on integrated energy coupling optimization operation method of industrial park based on novel power system. https://doi.org/10.19753/j.issn1001-1390.2026.03.004
MLA
al, DUAN Meimei et. "Research on integrated energy coupling optimization operation method of industrial park based on novel power system." 2026. https://doi.org/10.19753/j.issn1001-1390.2026.03.004.
Chicago
al, DUAN Meimei et. 2026. "Research on integrated energy coupling optimization operation method of industrial park based on novel power system.". https://doi.org/10.19753/j.issn1001-1390.2026.03.004.
Harvard
al, D. M. E. 2026, Research on integrated energy coupling optimization operation method of industrial park based on novel power system, Harbin Jinhe Electrical Measurement & Instrumentation Magazine Publishing Co, Ltd, available at: https://doi.org/10.19753/j.issn1001-1390.2026.03.004 [Accessed 8 Aug. 2026].
Dettagli della risorsa
Informazioni bibliografiche utili per verificare che sia il materiale corretto.
- Titolo
- Research on integrated energy coupling optimization operation method of industrial park based on novel power system
- Autore / collaboratori
- DUAN Meimei et al
- Editore
- Harbin Jinhe Electrical Measurement & Instrumentation Magazine Publishing Co., Ltd
- Anno di pubblicazione
- 2026
- ISSN
- 1001-1390
- ISSN
- 1001-1390
- Lingua
- zho
Soggetti
Esplora risorse correlate a partire da questi soggetti.