Perbandingan antara Metode Advance Use Case point dan Revised Use Case Point untuk Evaluasi Biaya Pengembangan Sistem Informasi Reservasi Ruangan

Mochamad Chandra Saputra et al · University of Brawijaya · 2020

Testo completo ad accesso aperto
Lettura rapida. Controlla i dati essenziali della risorsa e accedi al contenuto con il pulsante principale. La scheda mostra solo le informazioni necessarie per identificare, citare e aprire l’opera.

Accesso alla risorsa

Apri il contenuto dall’opzione principale o scegli un’altra fonte disponibile.

DOAJ DOAJ Articles
Entrar por DOAJ
Accesso principale

Testo completo ad accesso aperto

Texto completo identificado como acceso abierto.
Apri testo
Otras opciones de acceso Elegí el proveedor disponible para esta ficha.
DOAJ CSV Export DOAJ - Open Access Journals
Acceder por DOAJ CSV Export
Importación CSV DOAJ - Open Access Journals
Acceder por Importación CSV
DOAJ OAI-PMH DOAJ Articles
Acceder por DOAJ OAI-PMH

Altre opzioni disponibili

Se la risorsa è presente su più piattaforme, puoi scegliere dove aprirla.

DOAJ CSV Export DOAJ - Open Access Journals Accesso disponibile
Apri
Importación CSV DOAJ - Open Access Journals Accesso disponibile
Apri
DOAJ OAI-PMH DOAJ Articles Accesso disponibile
Apri

Riepilogo

Descripción general del contenido del recurso.

Proyek-proyek pengembangan perangkat lunak seringkali mengalami kegagalan karena tidak terpenuhinya batasan ruang lingkup, biaya dan waktu. Pada CV Gumcode Indonesia beberapa proyek mengalami keterlambatan dan kelebihan biaya karena metode perhitungan estimasi yang digunakan berupa campuran perhitungan dan dugaan, sehingga menghasilkan estimasi yang tidak tepat. Evaluasi terhadap metode estimasi dibutuhkan untuk menghasilkan estimasi yang lebih baik. Penelitian ini menjelaskan tentang estimasi biaya, waktu dan sumber daya yang dibutuhkan untuk pengembangkan Sistem Informasi Reservasi Ruangan yang mengacu pada Work Breakdown Structure dan menjadwalkan ke dalam Gantt Chart menggunakan metode Advance Use Case Point dan Revised Use Case Point. Data dikumpulkan dengan teknik wawancara kepada Manajer Proyek dan observasi pada sistem, yang diolah menjadi use case diagram dan use case scenario. Dari metode Advance Use Case Point diperoleh estimasi hours of effort sebesar 2.229,4 jam kerja dengan total biaya Rp 110.558.733,00 dan dikerjakan oleh 26 orang. Sedangkan, dari metode Revised Use Case Point diperoleh estimasi hours of effort sebesar 1.679,8 jam kerja dengan total biaya Rp 83.303.382,00 dan dikerjakan oleh 26 orang. Berdasarkan analisis perbandingan hasil kedua metode, metode Advance Use Case Point lebih direkomendasikan karena mencangkup fitur End-User Development yang dibutuhkan dalam Sistem Informasi Reservasi Ruangan. Abstract Many software development projects failed because they didn’t meet the limits of scope, cost and time. In CV Gumcode Indonesia, some projects experienced delay and the cost was overrun because the estimation method used is a mixture of calculations and guesses, resulting in incorrect estimates. This study described the cost, time and resource estimation needed to develop a Room Reservation Information System that referred to the Work Breakdown Structure and scheduled it into the Gantt Chart using the Advance Use Case Point and Revised Use Case Point methods. Data is collected by interviewing the Project Manager and observing the system, which is processed into a use case diagram and use case scenario as input for both methods. The Advance Use Case Point method produces hour of effort estimate of 2,229.4 hours of work with a total cost of Rp 110,558,733.00 and is done by 26 people. The Revised Use Case Point method produces hours of effort estimation of 1,679.8 working hours with a total cost of Rp. 83,303,382.00 and is done by 26 people. Based on the results of the comparative analysis, the Advance Use Case Point method is more recommended because it covers the End-User Development features needed in the Room Reservation Information System.

Come citare

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

al, M. C. S. E. (2020). Perbandingan antara Metode Advance Use Case point dan Revised Use Case Point untuk Evaluasi Biaya Pengembangan Sistem Informasi Reservasi Ruangan. http://175.45.187.242:80/index.php/jtiik/article/view/1329

MLA

al, Mochamad Chandra Saputra et. "Perbandingan antara Metode Advance Use Case point dan Revised Use Case Point untuk Evaluasi Biaya Pengembangan Sistem Informasi Reservasi Ruangan." 2020. http://175.45.187.242:80/index.php/jtiik/article/view/1329.

Chicago

al, Mochamad Chandra Saputra et. 2020. "Perbandingan antara Metode Advance Use Case point dan Revised Use Case Point untuk Evaluasi Biaya Pengembangan Sistem Informasi Reservasi Ruangan.". http://175.45.187.242:80/index.php/jtiik/article/view/1329.

Harvard

al, M. C. S. E. 2020, Perbandingan antara Metode Advance Use Case point dan Revised Use Case Point untuk Evaluasi Biaya Pengembangan Sistem Informasi Reservasi Ruangan, University of Brawijaya, available at: http://175.45.187.242:80/index.php/jtiik/article/view/1329 [Accessed 7 Aug. 2026].

Condividi e stampa

Salva la scheda, copia il link permanente o stampala in PDF.

Esporta riferimento

Esporta il record nei formati più comuni per usarlo con un gestore bibliografico.

Dettagli della risorsa

Informazioni bibliografiche utili per verificare che sia il materiale corretto.

Titolo
Perbandingan antara Metode Advance Use Case point dan Revised Use Case Point untuk Evaluasi Biaya Pengembangan Sistem Informasi Reservasi Ruangan
Autore / collaboratori
Mochamad Chandra Saputra et al
Editore
University of Brawijaya
Anno di pubblicazione
2020
ISSN
2355-7699
ISSN
2355-7699
Lingua
ind