Torna ai risultati
Scheda bibliografica · Consultazione e accesso
Artículo

Risk Analysis in the Construction Industry Using Project Management Life Cycle and House of Risk

Ananda Syalsabila Hidayat et al · Lembaga Penelitian dan Pengabdian kepada Masyarakat · 2025

Testo completo ad accesso aperto
Lettura rapida. Controlla i dati essenziali della risorsa e accedi al contenuto con il pulsante principale. La scheda mostra solo le informazioni necessarie per identificare, citare e aprire l’opera.

Accesso alla risorsa

Apri il contenuto dall’opzione principale o scegli un’altra fonte disponibile.

DOAJ DOAJ Articles
Entrar por DOAJ
Accesso principale

Testo completo ad accesso aperto

Texto completo identificado como acceso abierto.
Apri testo

Riepilogo

Descripción general del contenido del recurso.

This study aims to identify risks arising in housing construction projects, particularly those related to budget overruns, and to develop mitigation strategies to ensure that projects run according to plan in terms of cost, time, and resources. The methods used are the Project Management Life Cycle (PMLC) to map the project stages from initiation to closure, and the House of Risk (HoR) to identify risk events and risk agents. The novelty of this study lies in the development of difficulty analysis in HoR, which focuses on three main aspects —cost, time, and resources — that have not been explicitly described in previous studies. The results show that the project experienced a cost increase from IDR 150 million to IDR 165 million due to dominant risks, including misinterpretation of design drawings, fluctuations in material prices, and work delays. Through HoR analysis, priority risks were successfully identified, and mitigation strategies were developed in the form of team training to improve design understanding, control of material usage, and the implementation of contingency planning. This research contributes academically by modifying the HoR method with difficulty analysis based on cost, time, and resources, and integrating it with PMLC. It also provides practical guidance to contractors and project managers on anticipating and managing risks more effectively, thereby improving cost efficiency, timeliness, and resource optimization in housing construction projects.

Come citare

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

al, A. S. H. E. (2025). Risk Analysis in the Construction Industry Using Project Management Life Cycle and House of Risk. https://doi.org/10.21107/rekayasa.v18i2.30820

MLA

al, Ananda Syalsabila Hidayat et. "Risk Analysis in the Construction Industry Using Project Management Life Cycle and House of Risk." 2025. https://doi.org/10.21107/rekayasa.v18i2.30820.

Chicago

al, Ananda Syalsabila Hidayat et. 2025. "Risk Analysis in the Construction Industry Using Project Management Life Cycle and House of Risk.". https://doi.org/10.21107/rekayasa.v18i2.30820.

Harvard

al, A. S. H. E. 2025, Risk Analysis in the Construction Industry Using Project Management Life Cycle and House of Risk, Lembaga Penelitian dan Pengabdian kepada Masyarakat, available at: https://doi.org/10.21107/rekayasa.v18i2.30820 [Accessed 8 Aug. 2026].

Condividi e stampa

Salva la scheda, copia il link permanente o stampala in PDF.

Esporta riferimento

Esporta il record nei formati più comuni per usarlo con un gestore bibliografico.

Dettagli della risorsa

Informazioni bibliografiche utili per verificare che sia il materiale corretto.

Titolo
Risk Analysis in the Construction Industry Using Project Management Life Cycle and House of Risk
Autore / collaboratori
Ananda Syalsabila Hidayat et al
Editore
Lembaga Penelitian dan Pengabdian kepada Masyarakat
Anno di pubblicazione
2025
ISSN
0216-9495
ISSN
0216-9495
Lingua
Inglés

Soggetti

Esplora risorse correlate a partire da questi soggetti.

Copiato