Analisis Faktor Penyebab Time Overrun Proyek Pembangkit Listrik Dengan Pendekatan Partial Least Square Structural Equation Modeling

Agus Dwi Ariyanto et al · Lembaga Penelitian dan Pengabdian kepada Masyarakat · 2024

Testo completo ad accesso aperto
Lettura rapida. Controlla i dati essenziali della risorsa e accedi al contenuto con il pulsante principale. La scheda mostra solo le informazioni necessarie per identificare, citare e aprire l’opera.

Accesso alla risorsa

Apri il contenuto dall’opzione principale o scegli un’altra fonte disponibile.

DOAJ DOAJ Articles
Entrar por DOAJ
Accesso principale

Testo completo ad accesso aperto

Texto completo identificado como acceso abierto.
Apri testo

Riepilogo

Descripción general del contenido del recurso.

Power plant projects are crucial to providing andining a reliable power system. Power plant projects, like other construction projects, often experience a problem of delayed completion of work known as time overrun, which can result in financial losses and project failure to be completed on time. Time overrun is overtime that exceeds the completion date specified in the contract or the project submission date agreed by both parties. Engineering, procurement, construction, and commissioning are all parts of the power plant construction project. In completing the project, it is essential to understand why the power plant construction project is delayed and how to properly mitigate the risk. This research is quantitative research, which means using a questionnaire. The aim of this study is to find out what caused the time overrun of the power plant project at the Timorese PLTU. Partial Least Square Structural Equation Modeling (PLS-SEM) is used to process data from questionnaire results. The results of the research showed that there were seven research hypotheses, with two accepted and five rejected. The external factors, and the owner-related factors are the time overrun factors based on the accepted hypothesis. Based on the cause of the time overrun, some mitigation measures can be recommended to management including a memorandum of understanding (MoU) scheme with stakeholders related to existing permits, a scheme related to contractual and technical procedures when unforeseen conditions occur and ensuring the quality of the results of the soil investigation.

Come citare

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

al, A. D. A. E. (2024). Analisis Faktor Penyebab Time Overrun Proyek Pembangkit Listrik Dengan Pendekatan Partial Least Square Structural Equation Modeling. https://doi.org/10.21107/rekayasa.v17i2.26597

MLA

al, Agus Dwi Ariyanto et. "Analisis Faktor Penyebab Time Overrun Proyek Pembangkit Listrik Dengan Pendekatan Partial Least Square Structural Equation Modeling." 2024. https://doi.org/10.21107/rekayasa.v17i2.26597.

Chicago

al, Agus Dwi Ariyanto et. 2024. "Analisis Faktor Penyebab Time Overrun Proyek Pembangkit Listrik Dengan Pendekatan Partial Least Square Structural Equation Modeling.". https://doi.org/10.21107/rekayasa.v17i2.26597.

Harvard

al, A. D. A. E. 2024, Analisis Faktor Penyebab Time Overrun Proyek Pembangkit Listrik Dengan Pendekatan Partial Least Square Structural Equation Modeling, Lembaga Penelitian dan Pengabdian kepada Masyarakat, available at: https://doi.org/10.21107/rekayasa.v17i2.26597 [Accessed 9 Aug. 2026].

Condividi e stampa

Salva la scheda, copia il link permanente o stampala in PDF.

Esporta riferimento

Esporta il record nei formati più comuni per usarlo con un gestore bibliografico.

Dettagli della risorsa

Informazioni bibliografiche utili per verificare che sia il materiale corretto.

Titolo
Analisis Faktor Penyebab Time Overrun Proyek Pembangkit Listrik Dengan Pendekatan Partial Least Square Structural Equation Modeling
Autore / collaboratori
Agus Dwi Ariyanto et al
Editore
Lembaga Penelitian dan Pengabdian kepada Masyarakat
Anno di pubblicazione
2024
ISSN
0216-9495
ISSN
0216-9495
Lingua
Inglés

Soggetti

Esplora risorse correlate a partire da questi soggetti.

Copiato