Torna ai risultati
Scheda bibliografica · Consultazione e accesso
Artículo

Research on collaborative scheduling and path planning of charging pile groups using graph attention network

Xian Jian Wei et al · European Alliance for Innovation (EAI) · 2026

Materiale supplementare disponibile
Lettura rapida. Controlla i dati essenziali della risorsa e accedi al contenuto con il pulsante principale. La scheda mostra solo le informazioni necessarie per identificare, citare e aprire l’opera.

Accesso alla risorsa

Apri il contenuto dall’opzione principale o scegli un’altra fonte disponibile.

DOAJ DOAJ Articles
Entrar por DOAJ
Accesso principale

Materiale supplementare disponibile

El enlace apunta a material asociado, anexos, tablas, datos o página complementaria. No se marca como libro/texto completo.
Apri materiale

Riepilogo

Descripción general del contenido del recurso.

INTRODUCTION: The uneven spatiotemporal distribution of electric vehicle (EV) charging demand and the limitations of traditional methods in adapting to dynamic correlations pose significant challenges to charging infrastructure management. OBJECTIVES: This study aims to propose a collaborative scheduling and path planning method for charging pile groups to optimize system efficiency, reduce user waiting time, lower costs, and balance grid load. METHODS: A spatiotemporal heterogeneous graph integrating charging station states, road networks, and grid conditions is constructed. A Graph Attention Network (GAT) with a multi-head attention mechanism is employed to dynamically capture node correlations. A joint optimization model for scheduling and path planning is established, utilizing an extended A* search algorithm within a multi-objective framework. RESULTS: Experimental results demonstrate that, compared to the Constant Power Method (CPM) and a traditional Graph Convolutional Network (GCN) method, the proposed GAT-based method reduces average user waiting time by 30-40%, decreases total system cost by 17.9%, improves the load balancing index to 0.45, reduces grid load variance by 42.4%, and successfully serves 1038 EVs. CONCLUSION: The proposed method effectively addresses the collaborative optimization of charging pile group resources, providing an innovative solution for building an efficient and stable EV charging network.

Come citare

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

al, X. J. W. E. (2026). Research on collaborative scheduling and path planning of charging pile groups using graph attention network. https://doi.org/10.4108/ew.11478

MLA

al, Xian Jian Wei et. "Research on collaborative scheduling and path planning of charging pile groups using graph attention network." 2026. https://doi.org/10.4108/ew.11478.

Chicago

al, Xian Jian Wei et. 2026. "Research on collaborative scheduling and path planning of charging pile groups using graph attention network.". https://doi.org/10.4108/ew.11478.

Harvard

al, X. J. W. E. 2026, Research on collaborative scheduling and path planning of charging pile groups using graph attention network, European Alliance for Innovation (EAI), available at: https://doi.org/10.4108/ew.11478 [Accessed 6 Aug. 2026].

Condividi e stampa

Salva la scheda, copia il link permanente o stampala in PDF.

Esporta riferimento

Esporta il record nei formati più comuni per usarlo con un gestore bibliografico.

Dettagli della risorsa

Informazioni bibliografiche utili per verificare che sia il materiale corretto.

Titolo
Research on collaborative scheduling and path planning of charging pile groups using graph attention network
Autore / collaboratori
Xian Jian Wei et al
Editore
European Alliance for Innovation (EAI)
Anno di pubblicazione
2026
ISSN
2032-944X
ISSN
2032-944X
Lingua
Inglés

Soggetti

Esplora risorse correlate a partire da questi soggetti.

Copiato