Torna ai risultati
Scheda bibliografica · Consultazione e accesso
Artículo

ANALYSIS OF TIME WASTE IN THE X WOVEN SARONG PRODUCTION PROCESS USING WASTE ASSESSMENT MODEL AT PT X

Laxmi Ratnaningsih et al · Universitas Trunojoyo Madura · 2025

Testo completo ad accesso aperto
Lettura rapida. Controlla i dati essenziali della risorsa e accedi al contenuto con il pulsante principale. La scheda mostra solo le informazioni necessarie per identificare, citare e aprire l’opera.

Accesso alla risorsa

Apri il contenuto dall’opzione principale o scegli un’altra fonte disponibile.

DOAJ DOAJ Articles
Entrar por DOAJ
Accesso principale

Testo completo ad accesso aperto

Texto completo identificado como acceso abierto.
Apri testo

Riepilogo

Descripción general del contenido del recurso.

PT X is a textile manufacturing company known as a prominent producer of woven sarongs. Among its various brands, the X sarong is the flagship product due to its high market value. Despite its large production scale, inefficiencies in the form of waste were detected within the production process. In this study, waste assessment model is applied to detect and categorize different kinds of inefficiencies or waste present in a process. The production flow is visualized using value stream mapping, and the value stream analysis tools are implemented to evaluate each process activity and identify its value added contribution. Root Cause Analysis (RCA) identifies the main causes of inefficiencies, and the 5W + 1H method is applied to formulate improvement strategies. WAM results indicate the highest to lowest waste percentages are: overproduction (22%), defects (20%), inventory (19%), transportation (15%), motion (13%), waiting (8%), and overprocessing (4%). Based on the proposed improvements, 14 non-value-added activities were eliminated, reducing total activities from 133 to 114 and cutting the process time by 139 minutes—from 3,853 to 3,714 minutes. Following the improvements, the Value Stream Mapping (VSM) analysis reveals a rise in Process Cycle Efficiency (PCE), improving from 67.5% to 70%, demonstrating a positive impact in minimizing waste and enhancing production efficiency.

Come citare

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

al, L. R. E. (2025). ANALYSIS OF TIME WASTE IN THE X WOVEN SARONG PRODUCTION PROCESS USING WASTE ASSESSMENT MODEL AT PT X. https://doi.org/10.21107/pamator.v18i3.30249

MLA

al, Laxmi Ratnaningsih et. "ANALYSIS OF TIME WASTE IN THE X WOVEN SARONG PRODUCTION PROCESS USING WASTE ASSESSMENT MODEL AT PT X." 2025. https://doi.org/10.21107/pamator.v18i3.30249.

Chicago

al, Laxmi Ratnaningsih et. 2025. "ANALYSIS OF TIME WASTE IN THE X WOVEN SARONG PRODUCTION PROCESS USING WASTE ASSESSMENT MODEL AT PT X.". https://doi.org/10.21107/pamator.v18i3.30249.

Harvard

al, L. R. E. 2025, ANALYSIS OF TIME WASTE IN THE X WOVEN SARONG PRODUCTION PROCESS USING WASTE ASSESSMENT MODEL AT PT X, Universitas Trunojoyo Madura, available at: https://doi.org/10.21107/pamator.v18i3.30249 [Accessed 8 Aug. 2026].

Condividi e stampa

Salva la scheda, copia il link permanente o stampala in PDF.

Esporta riferimento

Esporta il record nei formati più comuni per usarlo con un gestore bibliografico.

Dettagli della risorsa

Informazioni bibliografiche utili per verificare che sia il materiale corretto.

Titolo
ANALYSIS OF TIME WASTE IN THE X WOVEN SARONG PRODUCTION PROCESS USING WASTE ASSESSMENT MODEL AT PT X
Autore / collaboratori
Laxmi Ratnaningsih et al
Editore
Universitas Trunojoyo Madura
Anno di pubblicazione
2025
ISSN
1829-7935
ISSN
1829-7935
Lingua
Inglés

Soggetti

Esplora risorse correlate a partire da questi soggetti.

Copiato