Torna ai risultati
Scheda bibliografica · Consultazione e accesso
Artículo

Advanced digital solutions for construction waste management: A 4D BIM integrated scenario analysis

Abdulwahed Fazeli et al · KeAi Communications Co., Ltd · 2026

Accesso aperto disponibile
Lettura rapida. Controlla i dati essenziali della risorsa e accedi al contenuto con il pulsante principale. La scheda mostra solo le informazioni necessarie per identificare, citare e aprire l’opera.

Accesso alla risorsa

Apri il contenuto dall’opzione principale o scegli un’altra fonte disponibile.

DOAJ DOAJ Articles
Entrar por DOAJ
Accesso principale

Accesso aperto disponibile

Recurso identificado como acceso abierto, sin confirmar automáticamente si es texto completo directo.
Apri risorsa

Riepilogo

Descripción general del contenido del recurso.

Construction generates substantial material waste with environmental and economic impacts, yet current methods rarely integrate waste estimation with project schedules. This study develops and validates semi-automated 4D BIM framework that links element-level quantities to standardized resource specifications — CSI MasterFormat and the Iranian Cost Estimation Standard (ICES) — and propagates material-specific waste factors into a time-phased (Autodesk Navisworks Timeliner) analysis. Two custom applications (“Material-DB” and “Waste-Estimation”) import ICES items, map them to MasterFormat codes, compute waste by unit (area/volume/mass), and populate BIM parameters that are visualized over the construction programme. A municipal office project in Tehran (≈6800 m2, four floors) is used for validation. BIM-based estimates align with observed site waste within ≤17% deviation across key streams (e.g., concrete −7.6%, masonry −14.0%, tiles +8.0%, iron −16.7%), with concrete waste peaking early during foundations and primary envelopes. Five design/material scenarios demonstrate how the method supports fast scenario testing and cost appraisal; for example, Scenario 3 yields the lowest waste cost, whereas Scenarios 5 and 2 are highest. The framework enables schedule-aware waste planning, targeted design changes (e.g., exterior wall systems, stone/tile use), and routine waste audits, offering a replicable path towards time-cost-waste trade-off decisions in early project phases.

Come citare

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

al, A. F. E. (2026). Advanced digital solutions for construction waste management: A 4D BIM integrated scenario analysis. https://doi.org/10.1016/j.grets.2025.100318

MLA

al, Abdulwahed Fazeli et. "Advanced digital solutions for construction waste management: A 4D BIM integrated scenario analysis." 2026. https://doi.org/10.1016/j.grets.2025.100318.

Chicago

al, Abdulwahed Fazeli et. 2026. "Advanced digital solutions for construction waste management: A 4D BIM integrated scenario analysis.". https://doi.org/10.1016/j.grets.2025.100318.

Harvard

al, A. F. E. 2026, Advanced digital solutions for construction waste management: A 4D BIM integrated scenario analysis, KeAi Communications Co, Ltd, available at: https://doi.org/10.1016/j.grets.2025.100318 [Accessed 7 Aug. 2026].

Condividi e stampa

Salva la scheda, copia il link permanente o stampala in PDF.

Esporta riferimento

Esporta il record nei formati più comuni per usarlo con un gestore bibliografico.

Dettagli della risorsa

Informazioni bibliografiche utili per verificare che sia il materiale corretto.

Titolo
Advanced digital solutions for construction waste management: A 4D BIM integrated scenario analysis
Autore / collaboratori
Abdulwahed Fazeli et al
Editore
KeAi Communications Co., Ltd
Anno di pubblicazione
2026
ISSN
2949-7361
ISSN
2949-7361
Lingua
Inglés

Soggetti

Esplora risorse correlate a partire da questi soggetti.

Copiato