Application of vacuum preloading combining mixing pile method in treatment of tram foundation
ZHUANG Yan 1,3, WANG Xiao-dong 2, CHENG Jun 4 · Editorial Office of Chinese Journal of Geotechnical Engineering · 2017
3D cross-hole resistivity inversion imaging of surrounding rock based on distance weighting constraint algorithm
Acceso al recurso
Entrá al contenido desde la opción principal o elegí otra fuente disponible.
Acceso abierto disponible
Resumen
Descripción general del contenido del recurso.
Cómo citar
Elegí el formato que necesitás y copiá la referencia al portapapeles.
APA 7
ZHUANG Yan 1, 3. W. X. D. 2. C. J. 4. (2017). Application of vacuum preloading combining mixing pile method in treatment of tram foundation. https://doi.org/10.11779/CJGE2017S1033
MLA
ZHUANG Yan 1, 3, WANG Xiao-dong 2, CHENG Jun 4. "Application of vacuum preloading combining mixing pile method in treatment of tram foundation." 2017. https://doi.org/10.11779/CJGE2017S1033.
Chicago
ZHUANG Yan 1, 3, WANG Xiao-dong 2, CHENG Jun 4. 2017. "Application of vacuum preloading combining mixing pile method in treatment of tram foundation.". https://doi.org/10.11779/CJGE2017S1033.
Harvard
ZHUANG Yan 1, 3. W. X. D. 2. C. J. 4. 2017, Application of vacuum preloading combining mixing pile method in treatment of tram foundation, Editorial Office of Chinese Journal of Geotechnical Engineering, available at: https://doi.org/10.11779/CJGE2017S1033 [Accessed 29 Jun. 2026].
Detalles del recurso
Información bibliográfica útil para confirmar que se trata del material correcto.
- Título
- Application of vacuum preloading combining mixing pile method in treatment of tram foundation
- Autor / colaboradores
- ZHUANG Yan 1,3, WANG Xiao-dong 2, CHENG Jun 4
- Editorial
- Editorial Office of Chinese Journal of Geotechnical Engineering
- Año de publicación
- 2017
- ISSN
- 1000-4548
- ISSN
- 1000-4548
- Idioma
- eng
Materias
Explorá otros recursos relacionados a partir de estas materias.