Application of vacuum preloading combining mixing pile method in treatment of tram foundation
ZHUANG Yan 1,3, WANG Xiao-dong 2, CHENG Jun 4 · Editorial Office of Chinese Journal of Geotechnical Engineering · 2017
3D cross-hole resistivity inversion imaging of surrounding rock based on distance weighting constraint algorithm
Accesso alla risorsa
Apri il contenuto dall’opzione principale o scegli un’altra fonte disponibile.
Accesso aperto disponibile
Riepilogo
Descripción general del contenido del recurso.
Come citare
Elegí el formato que necesitás y copiá la referencia al portapapeles.
APA 7
ZHUANG Yan 1, 3. W. X. D. 2. C. J. 4. (2017). Application of vacuum preloading combining mixing pile method in treatment of tram foundation. https://doi.org/10.11779/CJGE2017S1033
MLA
ZHUANG Yan 1, 3, WANG Xiao-dong 2, CHENG Jun 4. "Application of vacuum preloading combining mixing pile method in treatment of tram foundation." 2017. https://doi.org/10.11779/CJGE2017S1033.
Chicago
ZHUANG Yan 1, 3, WANG Xiao-dong 2, CHENG Jun 4. 2017. "Application of vacuum preloading combining mixing pile method in treatment of tram foundation.". https://doi.org/10.11779/CJGE2017S1033.
Harvard
ZHUANG Yan 1, 3. W. X. D. 2. C. J. 4. 2017, Application of vacuum preloading combining mixing pile method in treatment of tram foundation, Editorial Office of Chinese Journal of Geotechnical Engineering, available at: https://doi.org/10.11779/CJGE2017S1033 [Accessed 7 Aug. 2026].
Dettagli della risorsa
Informazioni bibliografiche utili per verificare che sia il materiale corretto.
- Titolo
- Application of vacuum preloading combining mixing pile method in treatment of tram foundation
- Autore / collaboratori
- ZHUANG Yan 1,3, WANG Xiao-dong 2, CHENG Jun 4
- Editore
- Editorial Office of Chinese Journal of Geotechnical Engineering
- Anno di pubblicazione
- 2017
- ISSN
- 1000-4548
- ISSN
- 1000-4548
- Lingua
- Inglés
Soggetti
Esplora risorse correlate a partire da questi soggetti.