Application of real-time monitoring technology to foundation settlement of sloping breakwaters in construction

WANG Wei 1, XU Kai 1, WANG Hai-long 2, LI Lu-lu 2 · Editorial Office of Chinese Journal of Geotechnical Engineering · 2017

Materiale supplementare disponibile
Lettura rapida. Controlla i dati essenziali della risorsa e accedi al contenuto con il pulsante principale. La scheda mostra solo le informazioni necessarie per identificare, citare e aprire l’opera.
Pubblicazione seriale

3D cross-hole resistivity inversion imaging of surrounding rock based on distance weighting constraint algorithm

Questa pubblicazione seriale contiene 241 contenuti correlati.

Accesso alla risorsa

Apri il contenuto dall’opzione principale o scegli un’altra fonte disponibile.

DOAJ DOAJ Articles
Entrar por DOAJ
Accesso principale

Materiale supplementare disponibile

El enlace apunta a material asociado, anexos, tablas, datos o página complementaria. No se marca como libro/texto completo.
Apri materiale

Riepilogo

Descripción general del contenido del recurso.

In recent years, China's port construction exhibits the development trend of large scale and deep water, and many ports are not the same type of seawall construction. Riprap construction of sloping breakwaters in open waters endures many complex factors from the external environment. Especially, coastal regions have distribution of deep and soft soil layers. With the increase in riprap amount and breakwater size, the real-time monitoring of settlement deformation is critical to control construction speed and project quality. According to the project situation and the characteristics of GPS technique, a real-time monitoring method for foundation settlement of sloping breakwater is proposed, including manufacture, laying and observation of subsidence monitoring equipments. The application of engineering example shows that the proposed method is suitable for the complex environment of riprap construction, and the settlement monitoring information can provide reliable basis for adjusting the intensity of riprap so as to ensure the safety of sloping breakwaters.

Come citare

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

WANG Wei 1, X. K. 1. W. H. L. 2. L. L. L. 2. (2017). Application of real-time monitoring technology to foundation settlement of sloping breakwaters in construction. https://doi.org/10.11779/CJGE2017S1017

MLA

WANG Wei 1, XU Kai 1, WANG Hai-long 2, LI Lu-lu 2. "Application of real-time monitoring technology to foundation settlement of sloping breakwaters in construction." 2017. https://doi.org/10.11779/CJGE2017S1017.

Chicago

WANG Wei 1, XU Kai 1, WANG Hai-long 2, LI Lu-lu 2. 2017. "Application of real-time monitoring technology to foundation settlement of sloping breakwaters in construction.". https://doi.org/10.11779/CJGE2017S1017.

Harvard

WANG Wei 1, X. K. 1. W. H. L. 2. L. L. L. 2. 2017, Application of real-time monitoring technology to foundation settlement of sloping breakwaters in construction, Editorial Office of Chinese Journal of Geotechnical Engineering, available at: https://doi.org/10.11779/CJGE2017S1017 [Accessed 6 Aug. 2026].

Condividi e stampa

Salva la scheda, copia il link permanente o stampala in PDF.

Esporta riferimento

Esporta il record nei formati più comuni per usarlo con un gestore bibliografico.

Dettagli della risorsa

Informazioni bibliografiche utili per verificare che sia il materiale corretto.

Titolo
Application of real-time monitoring technology to foundation settlement of sloping breakwaters in construction
Autore / collaboratori
WANG Wei 1, XU Kai 1, WANG Hai-long 2, LI Lu-lu 2
Editore
Editorial Office of Chinese Journal of Geotechnical Engineering
Anno di pubblicazione
2017
ISSN
1000-4548
ISSN
1000-4548
Lingua
Inglés

Soggetti

Esplora risorse correlate a partire da questi soggetti.

Copiato