Voltar aos resultados
Registro bibliográfico · Consulta e acesso
Artículo de revista

Application of real-time monitoring technology to foundation settlement of sloping breakwaters in construction

WANG Wei 1, XU Kai 1, WANG Hai-long 2, LI Lu-lu 2 · Editorial Office of Chinese Journal of Geotechnical Engineering · 2017

Material complementar disponível
Leitura rápida. Confira os dados básicos do recurso e acesse o conteúdo pelo botão principal. Esta ficha mostra apenas as informações necessárias para identificar, citar e abrir a obra.
Publicação seriada

3D cross-hole resistivity inversion imaging of surrounding rock based on distance weighting constraint algorithm

Esta publicação seriada contém 241 conteúdos relacionados.

Acesso ao recurso

Acesse o conteúdo pela opção principal ou escolha outra fonte disponível.

DOAJ DOAJ Articles
Entrar por DOAJ
Acesso principal

Material complementar disponível

El enlace apunta a material asociado, anexos, tablas, datos o página complementaria. No se marca como libro/texto completo.
Abrir material

Resumo

Descripción general del contenido del recurso.

In recent years, China's port construction exhibits the development trend of large scale and deep water, and many ports are not the same type of seawall construction. Riprap construction of sloping breakwaters in open waters endures many complex factors from the external environment. Especially, coastal regions have distribution of deep and soft soil layers. With the increase in riprap amount and breakwater size, the real-time monitoring of settlement deformation is critical to control construction speed and project quality. According to the project situation and the characteristics of GPS technique, a real-time monitoring method for foundation settlement of sloping breakwater is proposed, including manufacture, laying and observation of subsidence monitoring equipments. The application of engineering example shows that the proposed method is suitable for the complex environment of riprap construction, and the settlement monitoring information can provide reliable basis for adjusting the intensity of riprap so as to ensure the safety of sloping breakwaters.

Como citar

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

WANG Wei 1, X. K. 1. W. H. L. 2. L. L. L. 2. (2017). Application of real-time monitoring technology to foundation settlement of sloping breakwaters in construction. https://doi.org/10.11779/CJGE2017S1017

MLA

WANG Wei 1, XU Kai 1, WANG Hai-long 2, LI Lu-lu 2. "Application of real-time monitoring technology to foundation settlement of sloping breakwaters in construction." 2017. https://doi.org/10.11779/CJGE2017S1017.

Chicago

WANG Wei 1, XU Kai 1, WANG Hai-long 2, LI Lu-lu 2. 2017. "Application of real-time monitoring technology to foundation settlement of sloping breakwaters in construction.". https://doi.org/10.11779/CJGE2017S1017.

Harvard

WANG Wei 1, X. K. 1. W. H. L. 2. L. L. L. 2. 2017, Application of real-time monitoring technology to foundation settlement of sloping breakwaters in construction, Editorial Office of Chinese Journal of Geotechnical Engineering, available at: https://doi.org/10.11779/CJGE2017S1017 [Accessed 7 Aug. 2026].

Compartilhar e imprimir

Salve a ficha, copie o link permanente ou imprima em PDF.

Exportar referência

Exporte o registro nos formatos mais comuns para usar em um gerenciador bibliográfico.

Detalhes do recurso

Informações bibliográficas para confirmar que este é o material correto.

Título
Application of real-time monitoring technology to foundation settlement of sloping breakwaters in construction
Autor / colaboradores
WANG Wei 1, XU Kai 1, WANG Hai-long 2, LI Lu-lu 2
Editora
Editorial Office of Chinese Journal of Geotechnical Engineering
Ano de publicação
2017
ISSN
1000-4548
ISSN
1000-4548
Idioma
Inglés

Assuntos

Explore recursos relacionados a partir destes assuntos.

Copiado