Enhancement of technological well productivity during in situ leaching using optimized multi-strand detonation cord charges (12–20 g/m): experimental study
Sherzod Zairov et al · SpringerOpen · 2026
Accesso alla risorsa
Apri il contenuto dall’opzione principale o scegli un’altra fonte disponibile.
Accesso aperto disponibile
Riepilogo
Descripción general del contenido del recurso.
Come citare
Elegí el formato que necesitás y copiá la referencia al portapapeles.
APA 7
al, S. Z. E. (2026). Enhancement of technological well productivity during in situ leaching using optimized multi-strand detonation cord charges (12–20 g/m): experimental study. https://doi.org/10.1186/s44147-026-01022-6
MLA
al, Sherzod Zairov et. "Enhancement of technological well productivity during in situ leaching using optimized multi-strand detonation cord charges (12–20 g/m): experimental study." 2026. https://doi.org/10.1186/s44147-026-01022-6.
Chicago
al, Sherzod Zairov et. 2026. "Enhancement of technological well productivity during in situ leaching using optimized multi-strand detonation cord charges (12–20 g/m): experimental study.". https://doi.org/10.1186/s44147-026-01022-6.
Harvard
al, S. Z. E. 2026, Enhancement of technological well productivity during in situ leaching using optimized multi-strand detonation cord charges (12–20 g/m): experimental study, SpringerOpen, available at: https://doi.org/10.1186/s44147-026-01022-6 [Accessed 10 Aug. 2026].
Dettagli della risorsa
Informazioni bibliografiche utili per verificare che sia il materiale corretto.
- Titolo
- Enhancement of technological well productivity during in situ leaching using optimized multi-strand detonation cord charges (12–20 g/m): experimental study
- Autore / collaboratori
- Sherzod Zairov et al
- Editore
- SpringerOpen
- Anno di pubblicazione
- 2026
- ISSN
- 1110-1903
- ISSN
- 1110-1903
- Lingua
- Inglés
Soggetti
Esplora risorse correlate a partire da questi soggetti.