Torna ai risultati
Scheda bibliografica · Consultazione e accesso
Artículo

Fast Estimation of Loader’s Shovel Load Volume by 3D Reconstruction of Material Piles

Binyun Wu et al · KeAi Communications Co., Ltd · 2023

Accesso aperto disponibile
Lettura rapida. Controlla i dati essenziali della risorsa e accedi al contenuto con il pulsante principale. La scheda mostra solo le informazioni necessarie per identificare, citare e aprire l’opera.

Accesso alla risorsa

Apri il contenuto dall’opzione principale o scegli un’altra fonte disponibile.

DOAJ DOAJ Articles
Entrar por DOAJ
Accesso principale

Accesso aperto disponibile

Recurso identificado como acceso abierto, sin confirmar automáticamente si es texto completo directo.
Apri risorsa

Riepilogo

Descripción general del contenido del recurso.

Abstract Fast and accurate measurement of the volume of earthmoving materials is of great significance for the real-time evaluation of loader operation efficiency and the realization of autonomous operation. Existing methods for volume measurement, such as total station-based methods, cannot measure the volume in real time, while the bucket-based method also has the disadvantage of poor universality. In this study, a fast estimation method for a loader’s shovel load volume by 3D reconstruction of material piles is proposed. First, a dense stereo matching method (QORB–MAPM) was proposed by integrating the improved quadtree ORB algorithm (QORB) and the maximum a posteriori probability model (MAPM), which achieves fast matching of feature points and dense 3D reconstruction of material piles. Second, the 3D point cloud model of the material piles before and after shoveling was registered and segmented to obtain the 3D point cloud model of the shoveling area, and the Alpha-shape algorithm of Delaunay triangulation was used to estimate the volume of the 3D point cloud model. Finally, a shovel loading volume measurement experiment was conducted under loose-soil working conditions. The results show that the shovel loading volume estimation method (QORB–MAPM VE) proposed in this study has higher estimation accuracy and less calculation time in volume estimation and bucket fill factor estimation, and it has significant theoretical research and engineering application value.

Come citare

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

al, B. W. E. (2023). Fast Estimation of Loader’s Shovel Load Volume by 3D Reconstruction of Material Piles. https://doi.org/10.1186/s10033-023-00945-y

MLA

al, Binyun Wu et. "Fast Estimation of Loader’s Shovel Load Volume by 3D Reconstruction of Material Piles." 2023. https://doi.org/10.1186/s10033-023-00945-y.

Chicago

al, Binyun Wu et. 2023. "Fast Estimation of Loader’s Shovel Load Volume by 3D Reconstruction of Material Piles.". https://doi.org/10.1186/s10033-023-00945-y.

Harvard

al, B. W. E. 2023, Fast Estimation of Loader’s Shovel Load Volume by 3D Reconstruction of Material Piles, KeAi Communications Co, Ltd, available at: https://doi.org/10.1186/s10033-023-00945-y [Accessed 8 Aug. 2026].

Condividi e stampa

Salva la scheda, copia il link permanente o stampala in PDF.

Esporta riferimento

Esporta il record nei formati più comuni per usarlo con un gestore bibliografico.

Dettagli della risorsa

Informazioni bibliografiche utili per verificare che sia il materiale corretto.

Titolo
Fast Estimation of Loader’s Shovel Load Volume by 3D Reconstruction of Material Piles
Autore / collaboratori
Binyun Wu et al
Editore
KeAi Communications Co., Ltd
Anno di pubblicazione
2023
ISSN
2192-8258
ISSN
2192-8258
Lingua
Inglés

Soggetti

Esplora risorse correlate a partire da questi soggetti.

Copiato