Torna ai risultati
Scheda bibliografica · Consultazione e accesso
Artículo

Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop

Wangming Li et al · KeAi Communications Co., Ltd · 2022

Accesso aperto disponibile
Lettura rapida. Controlla i dati essenziali della risorsa e accedi al contenuto con il pulsante principale. La scheda mostra solo le informazioni necessarie per identificare, citare e aprire l’opera.

Accesso alla risorsa

Apri il contenuto dall’opzione principale o scegli un’altra fonte disponibile.

DOAJ DOAJ Articles
Entrar por DOAJ
Accesso principale

Accesso aperto disponibile

Recurso identificado como acceso abierto, sin confirmar automáticamente si es texto completo directo.
Apri risorsa

Riepilogo

Descripción general del contenido del recurso.

Abstract The connection between production scheduling and transportation scheduling is getting closer in smart manufacturing system, and both of those problems are summarized as NP-hard problems. However, only a few studies have considered them simultaneously. This paper solves the integrated production and transportation scheduling problem (IPTSP) in hybrid flow shops, which is an extension of the hybrid flow shop scheduling problem (HFSP). In addition to the production scheduling on machines, the transportation scheduling process on automated guided vehicles (AGVs) is considered as another optimization process. In this problem, the transfer tasks of jobs are performed by a certain number of AGVs. To solve it, we make some preparation (including the establishment of task pool, the new solution representation and the new solution evaluation), which can ensure that satisfactory solutions can be found efficiently while appropriately reducing the scale of search space. Then, an effective genetic tabu search algorithm is used to minimize the makespan. Finally, two groups of instances are designed and three types of experiments are conducted to evaluate the performance of the proposed method. The results show that the proposed method is effective to solve the integrated production and transportation scheduling problem.

Come citare

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

al, W. L. E. (2022). Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop. https://doi.org/10.1186/s10033-022-00683-7

MLA

al, Wangming Li et. "Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop." 2022. https://doi.org/10.1186/s10033-022-00683-7.

Chicago

al, Wangming Li et. 2022. "Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop.". https://doi.org/10.1186/s10033-022-00683-7.

Harvard

al, W. L. E. 2022, Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop, KeAi Communications Co, Ltd, available at: https://doi.org/10.1186/s10033-022-00683-7 [Accessed 6 Aug. 2026].

Condividi e stampa

Salva la scheda, copia il link permanente o stampala in PDF.

Esporta riferimento

Esporta il record nei formati più comuni per usarlo con un gestore bibliografico.

Dettagli della risorsa

Informazioni bibliografiche utili per verificare che sia il materiale corretto.

Titolo
Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop
Autore / collaboratori
Wangming Li et al
Editore
KeAi Communications Co., Ltd
Anno di pubblicazione
2022
ISSN
1000-9345
ISSN
1000-9345
Lingua
Inglés

Soggetti

Esplora risorse correlate a partire da questi soggetti.

Copiato