Voltar aos resultados
Registro bibliográfico · Consulta e acesso
Artículo

Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop

Wangming Li et al · KeAi Communications Co., Ltd · 2022

Acesso aberto disponível
Leitura rápida. Confira os dados básicos do recurso e acesse o conteúdo pelo botão principal. Esta ficha mostra apenas as informações necessárias para identificar, citar e abrir a obra.

Acesso ao recurso

Acesse o conteúdo pela opção principal ou escolha outra fonte disponível.

DOAJ DOAJ Articles
Entrar por DOAJ
Acesso principal

Acesso aberto disponível

Recurso identificado como acceso abierto, sin confirmar automáticamente si es texto completo directo.
Abrir recurso

Resumo

Descripción general del contenido del recurso.

Abstract The connection between production scheduling and transportation scheduling is getting closer in smart manufacturing system, and both of those problems are summarized as NP-hard problems. However, only a few studies have considered them simultaneously. This paper solves the integrated production and transportation scheduling problem (IPTSP) in hybrid flow shops, which is an extension of the hybrid flow shop scheduling problem (HFSP). In addition to the production scheduling on machines, the transportation scheduling process on automated guided vehicles (AGVs) is considered as another optimization process. In this problem, the transfer tasks of jobs are performed by a certain number of AGVs. To solve it, we make some preparation (including the establishment of task pool, the new solution representation and the new solution evaluation), which can ensure that satisfactory solutions can be found efficiently while appropriately reducing the scale of search space. Then, an effective genetic tabu search algorithm is used to minimize the makespan. Finally, two groups of instances are designed and three types of experiments are conducted to evaluate the performance of the proposed method. The results show that the proposed method is effective to solve the integrated production and transportation scheduling problem.

Como citar

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

al, W. L. E. (2022). Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop. https://doi.org/10.1186/s10033-022-00683-7

MLA

al, Wangming Li et. "Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop." 2022. https://doi.org/10.1186/s10033-022-00683-7.

Chicago

al, Wangming Li et. 2022. "Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop.". https://doi.org/10.1186/s10033-022-00683-7.

Harvard

al, W. L. E. 2022, Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop, KeAi Communications Co, Ltd, available at: https://doi.org/10.1186/s10033-022-00683-7 [Accessed 6 Aug. 2026].

Compartilhar e imprimir

Salve a ficha, copie o link permanente ou imprima em PDF.

Exportar referência

Exporte o registro nos formatos mais comuns para usar em um gerenciador bibliográfico.

Detalhes do recurso

Informações bibliográficas para confirmar que este é o material correto.

Título
Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop
Autor / colaboradores
Wangming Li et al
Editora
KeAi Communications Co., Ltd
Ano de publicação
2022
ISSN
1000-9345
ISSN
1000-9345
Idioma
Inglés

Assuntos

Explore recursos relacionados a partir destes assuntos.

Copiado