Torna ai risultati
Scheda bibliografica · Consultazione e accesso
Artículo

RISK EVALUATION OF PRODUCTION AND IMPLEMENTATION OF THE PROJECT

Božica Radoš et al · Faculty of Tourism and Rural Development in Pozega · 2017

Accesso istituzionale disponibile
Lettura rapida. Controlla i dati essenziali della risorsa e accedi al contenuto con il pulsante principale. La scheda mostra solo le informazioni necessarie per identificare, citare e aprire l’opera.

Accesso alla risorsa

Apri il contenuto dall’opzione principale o scegli un’altra fonte disponibile.

DOAJ DOAJ Articles
Entrar por DOAJ
Accesso principale

Accesso istituzionale disponibile

El acceso puede requerir institución, suscripción, proxy, VPN o autenticación.
Apri accesso

Riepilogo

Descripción general del contenido del recurso.

One of the key parts during the project cycle of the technical projects is also a risk evaluation of production and implementation of the project itself in all phases of the production. In this paper, we will examine the correlation of one of the risks (i.a. political risk) that are taken in consideration during risk analysis production and which are in direct correlation with the current status of country’s development status in which the projects are conducted, specifically in this case of countries which are new members of EU. Critical risk in that case is the policy and institutional aspects, including existing economic policies and development plans, organisation and management of services to be provided/developed by the project, as well as capacity and quality of the institutions involved.

Come citare

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

al, B. R. E. (2017). RISK EVALUATION OF PRODUCTION AND IMPLEMENTATION OF THE PROJECT. https://doi.org/10.2507/IJVA.3.2.3.36

MLA

al, Božica Radoš et. "RISK EVALUATION OF PRODUCTION AND IMPLEMENTATION OF THE PROJECT." 2017. https://doi.org/10.2507/IJVA.3.2.3.36.

Chicago

al, Božica Radoš et. 2017. "RISK EVALUATION OF PRODUCTION AND IMPLEMENTATION OF THE PROJECT.". https://doi.org/10.2507/IJVA.3.2.3.36.

Harvard

al, B. R. E. 2017, RISK EVALUATION OF PRODUCTION AND IMPLEMENTATION OF THE PROJECT, Faculty of Tourism and Rural Development in Pozega, available at: https://doi.org/10.2507/IJVA.3.2.3.36 [Accessed 8 Aug. 2026].

Condividi e stampa

Salva la scheda, copia il link permanente o stampala in PDF.

Esporta riferimento

Esporta il record nei formati più comuni per usarlo con un gestore bibliografico.

Dettagli della risorsa

Informazioni bibliografiche utili per verificare che sia il materiale corretto.

Titolo
RISK EVALUATION OF PRODUCTION AND IMPLEMENTATION OF THE PROJECT
Autore / collaboratori
Božica Radoš et al
Editore
Faculty of Tourism and Rural Development in Pozega
Anno di pubblicazione
2017
ISSN
2412-5210
ISSN
2412-5210
Lingua
Inglés

Soggetti

Esplora risorse correlate a partire da questi soggetti.

Copiato