Volver a resultados
Ficha bibliográfica · Consulta y acceso
Document

A weight-based algorithm to deal with due dates in flexible package production scheduling

Ibáñez, Francisco S. et al · SEDICI UNLP · 2004

Acceso abierto al texto completo
Lectura rápida. Revisá los datos básicos del recurso y luego accedé al contenido desde el botón principal. En esta ficha solo se muestra la información necesaria para identificar la obra, citarla y abrirla.

Acceso al recurso

Entrá al contenido desde la opción principal o elegí otra fuente disponible.

SEDICI UNLP SEDICI UNLP OAI-PMH
Entrar por SEDICI UNLP
Acceso principal

Acceso abierto al texto completo

Texto completo identificado como acceso abierto.
Abrir texto

Resumen

Descripción general del contenido del recurso.

This paper is an extension of a previous paper published in [2]. In this problem it is necessary to schedule several jobs that involve four process and for each one of them there is a group of machines available (of similar characteristics). Each activity is performed on just one machine. Besides, for our application, the scheduling must try to verify certain conditions. For each process (and consequently for all the activities that perform this process) there is a list of attributes. The problem is not only to assign each activity to a starting time and to a specific machine, but also to try to verify conditions that depend on the values of the attributes of the activities. Moreover, there are criteria to choose a particular machine An approach to solve this problem was presented first in [1]. As mentioned there, some due dates could not be fulfilled on time. An approach to decrease the quantity of due dates violations was presented in [2]. Roughly speaking, the algorithm presented in [1] is entirely dedicated to verify as many conditions as possible disregarding due dates violations. By the other hand, the algorithm shown in [2] was focussed to reduce the numer of due dates violations paying the price of decreasing the fulfillment of conditions. Roughl speaking, the first approach favour the company whereas the second one is more convenient for the customers. The present work includes an algorithm which allows to assign weights to set an appropriate trade-off between due date violations reduction and fulfillment of conditions Eje: V - Workshop de agentes y sistemas inteligentes Red de Universidades con Carreras en Informática (RedUNCI)

Cómo citar

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

Ibáñez, F. S. E. A. (2004). A weight-based algorithm to deal with due dates in flexible package production scheduling. SEDICI UNLP. http://sedici.unlp.edu.ar/handle/10915/22545

MLA

Ibáñez, Francisco S. et al. A weight-based algorithm to deal with due dates in flexible package production scheduling. SEDICI UNLP, 2004. http://sedici.unlp.edu.ar/handle/10915/22545.

Chicago

Ibáñez, Francisco S. et al. 2004. A weight-based algorithm to deal with due dates in flexible package production scheduling. SEDICI UNLP. http://sedici.unlp.edu.ar/handle/10915/22545.

Harvard

Ibáñez, F. S. E. A. 2004, A weight-based algorithm to deal with due dates in flexible package production scheduling, SEDICI UNLP, available at: http://sedici.unlp.edu.ar/handle/10915/22545 [Accessed 6 Aug. 2026].

Compartir e imprimir

Guardá la ficha, copiá su enlace permanente o imprimila como PDF.

Exportar referencia

Si usás un gestor bibliográfico, podés exportar el registro en los formatos más comunes.

Detalles del recurso

Información bibliográfica útil para confirmar que se trata del material correcto.

Título
A weight-based algorithm to deal with due dates in flexible package production scheduling
Autor / colaboradores
Ibáñez, Francisco S. et al
Editorial
SEDICI UNLP
Año de publicación
2004
Idioma
Inglés

Materias

Explorá otros recursos relacionados a partir de estas materias.

Copiado