Voltar aos resultados
Registro bibliográfico · Consulta e acesso
Document

A weight-based algorithm to deal with due dates in flexible package production scheduling

Ibáñez, Francisco S. et al · SEDICI UNLP · 2004

Texto completo em acesso aberto
Leitura rápida. Confira os dados básicos do recurso e acesse o conteúdo pelo botão principal. Esta ficha mostra apenas as informações necessárias para identificar, citar e abrir a obra.

Acesso ao recurso

Acesse o conteúdo pela opção principal ou escolha outra fonte disponível.

SEDICI UNLP SEDICI UNLP OAI-PMH
Entrar por SEDICI UNLP
Acesso principal

Texto completo em acesso aberto

Texto completo identificado como acceso abierto.
Abrir texto

Resumo

Descripción general del contenido del recurso.

This paper is an extension of a previous paper published in [2]. In this problem it is necessary to schedule several jobs that involve four process and for each one of them there is a group of machines available (of similar characteristics). Each activity is performed on just one machine. Besides, for our application, the scheduling must try to verify certain conditions. For each process (and consequently for all the activities that perform this process) there is a list of attributes. The problem is not only to assign each activity to a starting time and to a specific machine, but also to try to verify conditions that depend on the values of the attributes of the activities. Moreover, there are criteria to choose a particular machine An approach to solve this problem was presented first in [1]. As mentioned there, some due dates could not be fulfilled on time. An approach to decrease the quantity of due dates violations was presented in [2]. Roughly speaking, the algorithm presented in [1] is entirely dedicated to verify as many conditions as possible disregarding due dates violations. By the other hand, the algorithm shown in [2] was focussed to reduce the numer of due dates violations paying the price of decreasing the fulfillment of conditions. Roughl speaking, the first approach favour the company whereas the second one is more convenient for the customers. The present work includes an algorithm which allows to assign weights to set an appropriate trade-off between due date violations reduction and fulfillment of conditions Eje: V - Workshop de agentes y sistemas inteligentes Red de Universidades con Carreras en Informática (RedUNCI)

Como citar

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

Ibáñez, F. S. E. A. (2004). A weight-based algorithm to deal with due dates in flexible package production scheduling. SEDICI UNLP. http://sedici.unlp.edu.ar/handle/10915/22545

MLA

Ibáñez, Francisco S. et al. A weight-based algorithm to deal with due dates in flexible package production scheduling. SEDICI UNLP, 2004. http://sedici.unlp.edu.ar/handle/10915/22545.

Chicago

Ibáñez, Francisco S. et al. 2004. A weight-based algorithm to deal with due dates in flexible package production scheduling. SEDICI UNLP. http://sedici.unlp.edu.ar/handle/10915/22545.

Harvard

Ibáñez, F. S. E. A. 2004, A weight-based algorithm to deal with due dates in flexible package production scheduling, SEDICI UNLP, available at: http://sedici.unlp.edu.ar/handle/10915/22545 [Accessed 8 Aug. 2026].

Compartilhar e imprimir

Salve a ficha, copie o link permanente ou imprima em PDF.

Exportar referência

Exporte o registro nos formatos mais comuns para usar em um gerenciador bibliográfico.

Detalhes do recurso

Informações bibliográficas para confirmar que este é o material correto.

Título
A weight-based algorithm to deal with due dates in flexible package production scheduling
Autor / colaboradores
Ibáñez, Francisco S. et al
Editora
SEDICI UNLP
Ano de publicação
2004
Idioma
Inglés

Assuntos

Explore recursos relacionados a partir destes assuntos.

Copiado