Voltar aos resultados
Registro bibliográfico · Consulta e acesso
Document

An algorithm to deal with due date violation in a multi-objective scheduling problem

Ibáñez, Francisco S. et al · SEDICI UNLP · 2003

Texto completo em acesso aberto
Leitura rápida. Confira os dados básicos do recurso e acesse o conteúdo pelo botão principal. Esta ficha mostra apenas as informações necessárias para identificar, citar e abrir a obra.

Acesso ao recurso

Acesse o conteúdo pela opção principal ou escolha outra fonte disponível.

SEDICI UNLP SEDICI UNLP OAI-PMH
Entrar por SEDICI UNLP
Acesso principal

Texto completo em acesso aberto

Texto completo identificado como acceso abierto.
Abrir texto

Resumo

Descripción general del contenido del recurso.

This paper includes part of the strategies used to solve a scheduling problem developed for a company that produces flexible packaging, presented in quite a general form though. In this problem it is necessary to schedule several jobs that involve four process and for each one of them there is a group of machines available (of similar characteristics). Each activity is performed on just one machine. Besides, for our application, the scheduling must try to verify certain conditions. For each process (and consequently for all the activities that performs this process) there is a list of attributes. The problem is not only to assign each activity to a starting time and to a specific machine, but also to try to verify conditions that depend on the values of the attributes of the activities. Moreover, there are criteria to choose a particular machine. An approach to solve this problem was presented first in (Ibañez et al., 2001). As mentioned there, some jobs could not be fulfilled to meet their due dates. An approach to decrease the quantity of due dates violations was presented in (Ibañez et al., 2002). The algorithm presented in (Ibañez et al., 2001) is entirely dedicated to verify as many conditions as possible disregarding due date violations. The algorithm shown in (Ibañez et al., 2002) was focussed to reduce the number of due date violations by paying the price of decreasing the fulfilment of conditions. Roughly speaking, the first approach favours the company whereas the second one is more convenient for the customers. The present work includes an algorithm, which allows us to assign weights to set an appropriate trade of between due date violation reduction and fulfillment of conditions. Eje: Agentes y Sistemas Inteligentes (ASI) Red de Universidades con Carreras en Informática (RedUNCI)

Como citar

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

Ibáñez, F. S. E. A. (2003). An algorithm to deal with due date violation in a multi-objective scheduling problem. SEDICI UNLP. http://sedici.unlp.edu.ar/handle/10915/22861

MLA

Ibáñez, Francisco S. et al. An algorithm to deal with due date violation in a multi-objective scheduling problem. SEDICI UNLP, 2003. http://sedici.unlp.edu.ar/handle/10915/22861.

Chicago

Ibáñez, Francisco S. et al. 2003. An algorithm to deal with due date violation in a multi-objective scheduling problem. SEDICI UNLP. http://sedici.unlp.edu.ar/handle/10915/22861.

Harvard

Ibáñez, F. S. E. A. 2003, An algorithm to deal with due date violation in a multi-objective scheduling problem, SEDICI UNLP, available at: http://sedici.unlp.edu.ar/handle/10915/22861 [Accessed 6 Aug. 2026].

Compartilhar e imprimir

Salve a ficha, copie o link permanente ou imprima em PDF.

Exportar referência

Exporte o registro nos formatos mais comuns para usar em um gerenciador bibliográfico.

Detalhes do recurso

Informações bibliográficas para confirmar que este é o material correto.

Título
An algorithm to deal with due date violation in a multi-objective scheduling problem
Autor / colaboradores
Ibáñez, Francisco S. et al
Editora
SEDICI UNLP
Ano de publicação
2003
Idioma
Inglés

Assuntos

Explore recursos relacionados a partir destes assuntos.

Copiado