Torna ai risultati
Scheda bibliografica · Consultazione e accesso
Artículo

Scheduling the production of prefabrication construction supply chains considering variable delivery times

Chung Ho et al · Vilnius Gediminas Technical University · 2026

Testo completo ad accesso aperto
Lettura rapida. Controlla i dati essenziali della risorsa e accedi al contenuto con il pulsante principale. La scheda mostra solo le informazioni necessarie per identificare, citare e aprire l’opera.

Accesso alla risorsa

Apri il contenuto dall’opzione principale o scegli un’altra fonte disponibile.

DOAJ DOAJ Articles
Entrar por DOAJ
Accesso principale

Testo completo ad accesso aperto

Texto completo identificado como acceso abierto.
Apri testo

Riepilogo

Descripción general del contenido del recurso.

The application of prefabrication and modularization in the construction industry has grown significantly recently. The efficiency of prefabrication supply chains yields substantial advantages for construction projects. A challenge is the variability in delivery times, which negatively impacts the economy and reliability of prefabrication supply chains. Most construction prefabrication suppliers have difficulty adjusting their schedules in response to delivery time changes in a timely manner. Despite this critical challenge, limited research has addressed proactive and robust production scheduling to mitigate these uncertainties. This study investigates a method for proactive and robust production scheduling for construction prefabrication suppliers, particularly those with multiple fabrication shops, responding to changes in delivery times. This paper introduces a multi-objective, two-stage stochastic programming model that facilitates the production planning with multiple fabrication shops, considering variable delivery times. Computational results from an experimental study demonstrate that the proposed optimization model achieves a 14.6% cost reduction compared to the traditional EDD method. Computational results also show that the expected cost of the stochastic programming model achieves a cost reduction of 0.23% compared to a deterministic model. These findings suggest the model’s capability to generate robust and flexible schedules that effectively balance cost minimization with time reduction.

Come citare

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

al, C. H. E. (2026). Scheduling the production of prefabrication construction supply chains considering variable delivery times. https://doi.org/10.3846/jcem.2026.26156

MLA

al, Chung Ho et. "Scheduling the production of prefabrication construction supply chains considering variable delivery times." 2026. https://doi.org/10.3846/jcem.2026.26156.

Chicago

al, Chung Ho et. 2026. "Scheduling the production of prefabrication construction supply chains considering variable delivery times.". https://doi.org/10.3846/jcem.2026.26156.

Harvard

al, C. H. E. 2026, Scheduling the production of prefabrication construction supply chains considering variable delivery times, Vilnius Gediminas Technical University, available at: https://doi.org/10.3846/jcem.2026.26156 [Accessed 6 Aug. 2026].

Condividi e stampa

Salva la scheda, copia il link permanente o stampala in PDF.

Esporta riferimento

Esporta il record nei formati più comuni per usarlo con un gestore bibliografico.

Dettagli della risorsa

Informazioni bibliografiche utili per verificare che sia il materiale corretto.

Titolo
Scheduling the production of prefabrication construction supply chains considering variable delivery times
Autore / collaboratori
Chung Ho et al
Editore
Vilnius Gediminas Technical University
Anno di pubblicazione
2026
ISSN
1392-3730
ISSN
1392-3730
Lingua
Inglés

Soggetti

Esplora risorse correlate a partire da questi soggetti.

Copiato