Assessment of cost and schedule performance in construction of key nuclear reactors

Кароль Скіба et al · Kyiv National University of Construction and Architecture · 2025

Open-access full text
Quick overview. Review the resource’s basic details, then access the content using the main button. This page shows only the information needed to identify, cite, and open the work.

Resource access

Open the content from the main option or choose another available source.

DOAJ DOAJ Articles
Entrar por DOAJ
Main access

Open-access full text

Texto completo identificado como acceso abierto.
Open text

Summary

Descripción general del contenido del recurso.

The nuclear industry is a unique sector that is especially vulnerable to delays. A multitude of impactful factors such as the complexity of design, tight on-site schedules, and a logistically sophisticated end-to-end supply chain, to name just a few, make the entire project highly prone to complications. In 2017, it was estimated that nearly two-thirds of the 55 nuclear plants under construction at that time were behind schedule. Furthermore, since 2010, delays of this nature have been believed to have contributed to an almost 20% increase in the final costs of the projects. This work analyzed recent construction performance of Generation III/III+ nuclear reactor projects, specifically examining AP1000, EPR, and APR1400 technologies. Key performance indicators evaluated included planned versus actual construction times, costs, and capacity construction rates, revealing significant deviations across the analyzed projects. Each nuclear project's performance was quantitatively assessed using the schedule performance ratio, cost performance ratio, and an integrated performance coefficient to comprehensively compare efficiencies across different reactor technologies. Analysis further identified key reasons behind these deviations, such as evolving regulatory environments, safety requirements, project management inefficiencies, supply chain immaturity, and limited skilled workforce availability, which contributed to persistent first of a kind (FOAK) challenges and obscured the anticipated nth of a kind (NOAK) improvements. Based on these findings, recommendations are provided for future research, emphasizing the necessity to apply insights gained from large reactor deployment challenges to the emerging Small Modular Reactor (SMR) technologies.

How to cite

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

al, К. С. E. (2025). Assessment of cost and schedule performance in construction of key nuclear reactors. https://doi.org/10.32347/2522-4182.16.2025.5-21

MLA

al, Кароль Скіба et. "Assessment of cost and schedule performance in construction of key nuclear reactors." 2025. https://doi.org/10.32347/2522-4182.16.2025.5-21.

Chicago

al, Кароль Скіба et. 2025. "Assessment of cost and schedule performance in construction of key nuclear reactors.". https://doi.org/10.32347/2522-4182.16.2025.5-21.

Harvard

al, К. С. E. 2025, Assessment of cost and schedule performance in construction of key nuclear reactors, Kyiv National University of Construction and Architecture, available at: https://doi.org/10.32347/2522-4182.16.2025.5-21 [Accessed 6 Aug. 2026].

Share and print

Save the record, copy its permanent link, or print it as a PDF.

Export reference

You can export the record in common formats for use in a reference manager.

Resource details

Bibliographic information to help confirm that this is the correct material.

Title
Assessment of cost and schedule performance in construction of key nuclear reactors
Author / contributors
Кароль Скіба et al
Publisher
Kyiv National University of Construction and Architecture
Publication year
2025
ISSN
2522-4182
ISSN
2522-4182
Language
English

Subjects

Explore related resources through these subjects.

Copied