Back to results
Bibliographic record · Consultation and access
Artículo

Perbandingan antara Metode Advance Use Case point dan Revised Use Case Point untuk Evaluasi Biaya Pengembangan Sistem Informasi Reservasi Ruangan

Mochamad Chandra Saputra et al · University of Brawijaya · 2020

Open-access full text
Quick overview. Review the resource’s basic details, then access the content using the main button. This page shows only the information needed to identify, cite, and open the work.

Resource access

Open the content from the main option or choose another available source.

DOAJ DOAJ Articles
Entrar por DOAJ
Main access

Open-access full text

Texto completo identificado como acceso abierto.
Open text
Otras opciones de acceso Elegí el proveedor disponible para esta ficha.
DOAJ CSV Export DOAJ - Open Access Journals
Acceder por DOAJ CSV Export
Importación CSV DOAJ - Open Access Journals
Acceder por Importación CSV
DOAJ OAI-PMH DOAJ Articles
Acceder por DOAJ OAI-PMH

Other available options

When the resource is available on more than one platform, you can choose where to open it.

DOAJ CSV Export DOAJ - Open Access Journals Access available
Open
Importación CSV DOAJ - Open Access Journals Access available
Open
DOAJ OAI-PMH DOAJ Articles Access available
Open

Summary

Descripción general del contenido del recurso.

Proyek-proyek pengembangan perangkat lunak seringkali mengalami kegagalan karena tidak terpenuhinya batasan ruang lingkup, biaya dan waktu. Pada CV Gumcode Indonesia beberapa proyek mengalami keterlambatan dan kelebihan biaya karena metode perhitungan estimasi yang digunakan berupa campuran perhitungan dan dugaan, sehingga menghasilkan estimasi yang tidak tepat. Evaluasi terhadap metode estimasi dibutuhkan untuk menghasilkan estimasi yang lebih baik. Penelitian ini menjelaskan tentang estimasi biaya, waktu dan sumber daya yang dibutuhkan untuk pengembangkan Sistem Informasi Reservasi Ruangan yang mengacu pada Work Breakdown Structure dan menjadwalkan ke dalam Gantt Chart menggunakan metode Advance Use Case Point dan Revised Use Case Point. Data dikumpulkan dengan teknik wawancara kepada Manajer Proyek dan observasi pada sistem, yang diolah menjadi use case diagram dan use case scenario. Dari metode Advance Use Case Point diperoleh estimasi hours of effort sebesar 2.229,4 jam kerja dengan total biaya Rp 110.558.733,00 dan dikerjakan oleh 26 orang. Sedangkan, dari metode Revised Use Case Point diperoleh estimasi hours of effort sebesar 1.679,8 jam kerja dengan total biaya Rp 83.303.382,00 dan dikerjakan oleh 26 orang. Berdasarkan analisis perbandingan hasil kedua metode, metode Advance Use Case Point lebih direkomendasikan karena mencangkup fitur End-User Development yang dibutuhkan dalam Sistem Informasi Reservasi Ruangan. Abstract Many software development projects failed because they didn’t meet the limits of scope, cost and time. In CV Gumcode Indonesia, some projects experienced delay and the cost was overrun because the estimation method used is a mixture of calculations and guesses, resulting in incorrect estimates. This study described the cost, time and resource estimation needed to develop a Room Reservation Information System that referred to the Work Breakdown Structure and scheduled it into the Gantt Chart using the Advance Use Case Point and Revised Use Case Point methods. Data is collected by interviewing the Project Manager and observing the system, which is processed into a use case diagram and use case scenario as input for both methods. The Advance Use Case Point method produces hour of effort estimate of 2,229.4 hours of work with a total cost of Rp 110,558,733.00 and is done by 26 people. The Revised Use Case Point method produces hours of effort estimation of 1,679.8 working hours with a total cost of Rp. 83,303,382.00 and is done by 26 people. Based on the results of the comparative analysis, the Advance Use Case Point method is more recommended because it covers the End-User Development features needed in the Room Reservation Information System.

How to cite

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

al, M. C. S. E. (2020). Perbandingan antara Metode Advance Use Case point dan Revised Use Case Point untuk Evaluasi Biaya Pengembangan Sistem Informasi Reservasi Ruangan. http://175.45.187.242:80/index.php/jtiik/article/view/1329

MLA

al, Mochamad Chandra Saputra et. "Perbandingan antara Metode Advance Use Case point dan Revised Use Case Point untuk Evaluasi Biaya Pengembangan Sistem Informasi Reservasi Ruangan." 2020. http://175.45.187.242:80/index.php/jtiik/article/view/1329.

Chicago

al, Mochamad Chandra Saputra et. 2020. "Perbandingan antara Metode Advance Use Case point dan Revised Use Case Point untuk Evaluasi Biaya Pengembangan Sistem Informasi Reservasi Ruangan.". http://175.45.187.242:80/index.php/jtiik/article/view/1329.

Harvard

al, M. C. S. E. 2020, Perbandingan antara Metode Advance Use Case point dan Revised Use Case Point untuk Evaluasi Biaya Pengembangan Sistem Informasi Reservasi Ruangan, University of Brawijaya, available at: http://175.45.187.242:80/index.php/jtiik/article/view/1329 [Accessed 6 Aug. 2026].

Share and print

Save the record, copy its permanent link, or print it as a PDF.

Export reference

You can export the record in common formats for use in a reference manager.

Resource details

Bibliographic information to help confirm that this is the correct material.

Title
Perbandingan antara Metode Advance Use Case point dan Revised Use Case Point untuk Evaluasi Biaya Pengembangan Sistem Informasi Reservasi Ruangan
Author / contributors
Mochamad Chandra Saputra et al
Publisher
University of Brawijaya
Publication year
2020
ISSN
2355-7699
ISSN
2355-7699
Language
ind
Copied