Risk Analysis in the Construction Industry Using Project Management Life Cycle and House of Risk

Ananda Syalsabila Hidayat et al · Lembaga Penelitian dan Pengabdian kepada Masyarakat · 2025

Open-access full text
Quick overview. Review the resource’s basic details, then access the content using the main button. This page shows only the information needed to identify, cite, and open the work.

Resource access

Open the content from the main option or choose another available source.

DOAJ DOAJ Articles
Entrar por DOAJ
Main access

Open-access full text

Texto completo identificado como acceso abierto.
Open text

Summary

Descripción general del contenido del recurso.

This study aims to identify risks arising in housing construction projects, particularly those related to budget overruns, and to develop mitigation strategies to ensure that projects run according to plan in terms of cost, time, and resources. The methods used are the Project Management Life Cycle (PMLC) to map the project stages from initiation to closure, and the House of Risk (HoR) to identify risk events and risk agents. The novelty of this study lies in the development of difficulty analysis in HoR, which focuses on three main aspects —cost, time, and resources — that have not been explicitly described in previous studies. The results show that the project experienced a cost increase from IDR 150 million to IDR 165 million due to dominant risks, including misinterpretation of design drawings, fluctuations in material prices, and work delays. Through HoR analysis, priority risks were successfully identified, and mitigation strategies were developed in the form of team training to improve design understanding, control of material usage, and the implementation of contingency planning. This research contributes academically by modifying the HoR method with difficulty analysis based on cost, time, and resources, and integrating it with PMLC. It also provides practical guidance to contractors and project managers on anticipating and managing risks more effectively, thereby improving cost efficiency, timeliness, and resource optimization in housing construction projects.

How to cite

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

al, A. S. H. E. (2025). Risk Analysis in the Construction Industry Using Project Management Life Cycle and House of Risk. https://doi.org/10.21107/rekayasa.v18i2.30820

MLA

al, Ananda Syalsabila Hidayat et. "Risk Analysis in the Construction Industry Using Project Management Life Cycle and House of Risk." 2025. https://doi.org/10.21107/rekayasa.v18i2.30820.

Chicago

al, Ananda Syalsabila Hidayat et. 2025. "Risk Analysis in the Construction Industry Using Project Management Life Cycle and House of Risk.". https://doi.org/10.21107/rekayasa.v18i2.30820.

Harvard

al, A. S. H. E. 2025, Risk Analysis in the Construction Industry Using Project Management Life Cycle and House of Risk, Lembaga Penelitian dan Pengabdian kepada Masyarakat, available at: https://doi.org/10.21107/rekayasa.v18i2.30820 [Accessed 6 Aug. 2026].

Share and print

Save the record, copy its permanent link, or print it as a PDF.

Export reference

You can export the record in common formats for use in a reference manager.

Resource details

Bibliographic information to help confirm that this is the correct material.

Title
Risk Analysis in the Construction Industry Using Project Management Life Cycle and House of Risk
Author / contributors
Ananda Syalsabila Hidayat et al
Publisher
Lembaga Penelitian dan Pengabdian kepada Masyarakat
Publication year
2025
ISSN
0216-9495
ISSN
0216-9495
Language
English

Subjects

Explore related resources through these subjects.

Copied