Analisis Penyebab Keterlambatan Proyek Konstruksi Transmisi dan Gardu Induk: Studi Kasus Unit Induk Pembangunan Jawa Bagian Timur dan Bali (UIP JBTB)

Denta Prawidhana et al · Lembaga Penelitian dan Pengabdian kepada Masyarakat · 2025

Open-access full text
Quick overview. Review the resource’s basic details, then access the content using the main button. This page shows only the information needed to identify, cite, and open the work.

Resource access

Open the content from the main option or choose another available source.

DOAJ DOAJ Articles
Entrar por DOAJ
Main access

Open-access full text

Texto completo identificado como acceso abierto.
Open text

Summary

Descripción general del contenido del recurso.

As many as 87.63% of PT PLN (Persero) UIP JBTB Transmission and Substation construction projects in the 2010-2023 range experienced delays. The purpose of this study is to determine the main factors that contribute to project delays from the perceptions of internal, supervision consultants, and contractors and provide suggestions to Management to minimize potential losses due to delays in project completion in the future. The methods used in this research are literature study, data collection through survey, data analysis, and conclusion. Data analysis is done quantitatively using Frequency Index and Relative Importance Index, Independent T Test, Cartesian Diagram, and 5 Why's. The results of this study indicate that there are 5 most influential variables in delays, namely delays in land acquisition, community social conflicts, labor shortages, delays in submitting drawings, and cash flow difficulties. Strategic steps to overcome delays in project completion are to select prospective land for transmission and substation construction projects on undisputed land, create a project security MoU by involving security forces either TNI or Polri, create a smoother financial flow system, create an easy and effective payment system in the project, and monitor the administrative process and create an easier and safer document management system.

How to cite

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

al, D. P. E. (2025). Analisis Penyebab Keterlambatan Proyek Konstruksi Transmisi dan Gardu Induk: Studi Kasus Unit Induk Pembangunan Jawa Bagian Timur dan Bali (UIP JBTB). https://doi.org/10.21107/rekayasa.v17i3.28014

MLA

al, Denta Prawidhana et. "Analisis Penyebab Keterlambatan Proyek Konstruksi Transmisi dan Gardu Induk: Studi Kasus Unit Induk Pembangunan Jawa Bagian Timur dan Bali (UIP JBTB)." 2025. https://doi.org/10.21107/rekayasa.v17i3.28014.

Chicago

al, Denta Prawidhana et. 2025. "Analisis Penyebab Keterlambatan Proyek Konstruksi Transmisi dan Gardu Induk: Studi Kasus Unit Induk Pembangunan Jawa Bagian Timur dan Bali (UIP JBTB).". https://doi.org/10.21107/rekayasa.v17i3.28014.

Harvard

al, D. P. E. 2025, Analisis Penyebab Keterlambatan Proyek Konstruksi Transmisi dan Gardu Induk: Studi Kasus Unit Induk Pembangunan Jawa Bagian Timur dan Bali (UIP JBTB), Lembaga Penelitian dan Pengabdian kepada Masyarakat, available at: https://doi.org/10.21107/rekayasa.v17i3.28014 [Accessed 6 Aug. 2026].

Share and print

Save the record, copy its permanent link, or print it as a PDF.

Export reference

You can export the record in common formats for use in a reference manager.

Resource details

Bibliographic information to help confirm that this is the correct material.

Title
Analisis Penyebab Keterlambatan Proyek Konstruksi Transmisi dan Gardu Induk: Studi Kasus Unit Induk Pembangunan Jawa Bagian Timur dan Bali (UIP JBTB)
Author / contributors
Denta Prawidhana et al
Publisher
Lembaga Penelitian dan Pengabdian kepada Masyarakat
Publication year
2025
ISSN
0216-9495
ISSN
0216-9495
Language
English

Subjects

Explore related resources through these subjects.

Copied