Back to results
Bibliographic record · Consultation and access
Artículo

Performance Evaluation of Dolomite Fertilizer Production: AHP and Scoring System Approach Based on Performance Prism

Fitriatus Sholeha et al · Lembaga Penelitian dan Pengabdian kepada Masyarakat · 2024

Open-access full text
Quick overview. Review the resource’s basic details, then access the content using the main button. This page shows only the information needed to identify, cite, and open the work.

Resource access

Open the content from the main option or choose another available source.

DOAJ DOAJ Articles
Entrar por DOAJ
Main access

Open-access full text

Texto completo identificado como acceso abierto.
Open text

Summary

Descripción general del contenido del recurso.

Fertilizer production often faces various performance issues that can affect efficiency and productivity. One of the main problems is the instability in the quality of raw materials, which can result in variations in the quality of the final product. Workforce performance is also a critical factor, where inadequate training and low motivation can reduce productivity. The lack of an appropriate performance measurement system, such as relevant and accurate Key Performance Indicators (KPIs), can make it difficult for companies to monitor and improve their overall performance. To address these challenges, a performance measurement system is needed that can integrate various aspects of the company (stakeholders). This performance measurement system must be able to accommodate the interests of various parties involved in the company's operations to produce more accurate and relevant information. The performance measurement approach referred to is known as the Performance Prism. It is then supported by using the Objective Matrix (OMAX) method to determine the ranking and class calculation of each KPI and the Traffic Light System (TLS). Based on performance measurements using the Performance Prism, Analytic Hierarchy Process (AHP), and Scoring System at PT. XYZ, there are 53 KPIs divided among various stakeholders. From this analysis, it can be concluded that the design of the company's performance measurement encompasses various aspects involving both internal and external stakeholders. The total performance index of 13.43 indicates overall good performance. In this case, the total KPIs used are 53 KPIs, which include 10 KPIs for employee stakeholders, 5 KPIs for owner stakeholders, 10 KPIs for customer stakeholders, 5 KPIs for government stakeholders, 4 KPIs for investor stakeholders, 10 KPIs for supplier stakeholders, 4 KPIs for partner stakeholders, and 5 KPIs for surrounding community stakeholders. According to the results of the Objective Matrix (OMAX) and Traffic Light System (TLS), it can be seen that 47 KPIs fall into the green category, indicating good achievement, while 3 KPIs fall into the yellow category, and 3 other KPIs fall into the red category, indicating areas requiring further attention for improvement.

How to cite

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

al, F. S. E. (2024). Performance Evaluation of Dolomite Fertilizer Production: AHP and Scoring System Approach Based on Performance Prism. https://doi.org/10.21107/rekayasa.v17i2.25701

MLA

al, Fitriatus Sholeha et. "Performance Evaluation of Dolomite Fertilizer Production: AHP and Scoring System Approach Based on Performance Prism." 2024. https://doi.org/10.21107/rekayasa.v17i2.25701.

Chicago

al, Fitriatus Sholeha et. 2024. "Performance Evaluation of Dolomite Fertilizer Production: AHP and Scoring System Approach Based on Performance Prism.". https://doi.org/10.21107/rekayasa.v17i2.25701.

Harvard

al, F. S. E. 2024, Performance Evaluation of Dolomite Fertilizer Production: AHP and Scoring System Approach Based on Performance Prism, Lembaga Penelitian dan Pengabdian kepada Masyarakat, available at: https://doi.org/10.21107/rekayasa.v17i2.25701 [Accessed 5 Aug. 2026].

Share and print

Save the record, copy its permanent link, or print it as a PDF.

Export reference

You can export the record in common formats for use in a reference manager.

Resource details

Bibliographic information to help confirm that this is the correct material.

Title
Performance Evaluation of Dolomite Fertilizer Production: AHP and Scoring System Approach Based on Performance Prism
Author / contributors
Fitriatus Sholeha et al
Publisher
Lembaga Penelitian dan Pengabdian kepada Masyarakat
Publication year
2024
ISSN
0216-9495
ISSN
0216-9495
Language
English

Subjects

Explore related resources through these subjects.

Copied