Back to results
Bibliographic record · Consultation and access
Artículo

Research on collaborative scheduling and path planning of charging pile groups using graph attention network

Xian Jian Wei et al · European Alliance for Innovation (EAI) · 2026

Supplementary material available
Quick overview. Review the resource’s basic details, then access the content using the main button. This page shows only the information needed to identify, cite, and open the work.

Resource access

Open the content from the main option or choose another available source.

DOAJ DOAJ Articles
Entrar por DOAJ
Main access

Supplementary material available

El enlace apunta a material asociado, anexos, tablas, datos o página complementaria. No se marca como libro/texto completo.
Open material

Summary

Descripción general del contenido del recurso.

INTRODUCTION: The uneven spatiotemporal distribution of electric vehicle (EV) charging demand and the limitations of traditional methods in adapting to dynamic correlations pose significant challenges to charging infrastructure management. OBJECTIVES: This study aims to propose a collaborative scheduling and path planning method for charging pile groups to optimize system efficiency, reduce user waiting time, lower costs, and balance grid load. METHODS: A spatiotemporal heterogeneous graph integrating charging station states, road networks, and grid conditions is constructed. A Graph Attention Network (GAT) with a multi-head attention mechanism is employed to dynamically capture node correlations. A joint optimization model for scheduling and path planning is established, utilizing an extended A* search algorithm within a multi-objective framework. RESULTS: Experimental results demonstrate that, compared to the Constant Power Method (CPM) and a traditional Graph Convolutional Network (GCN) method, the proposed GAT-based method reduces average user waiting time by 30-40%, decreases total system cost by 17.9%, improves the load balancing index to 0.45, reduces grid load variance by 42.4%, and successfully serves 1038 EVs. CONCLUSION: The proposed method effectively addresses the collaborative optimization of charging pile group resources, providing an innovative solution for building an efficient and stable EV charging network.

How to cite

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

al, X. J. W. E. (2026). Research on collaborative scheduling and path planning of charging pile groups using graph attention network. https://doi.org/10.4108/ew.11478

MLA

al, Xian Jian Wei et. "Research on collaborative scheduling and path planning of charging pile groups using graph attention network." 2026. https://doi.org/10.4108/ew.11478.

Chicago

al, Xian Jian Wei et. 2026. "Research on collaborative scheduling and path planning of charging pile groups using graph attention network.". https://doi.org/10.4108/ew.11478.

Harvard

al, X. J. W. E. 2026, Research on collaborative scheduling and path planning of charging pile groups using graph attention network, European Alliance for Innovation (EAI), available at: https://doi.org/10.4108/ew.11478 [Accessed 6 Aug. 2026].

Share and print

Save the record, copy its permanent link, or print it as a PDF.

Export reference

You can export the record in common formats for use in a reference manager.

Resource details

Bibliographic information to help confirm that this is the correct material.

Title
Research on collaborative scheduling and path planning of charging pile groups using graph attention network
Author / contributors
Xian Jian Wei et al
Publisher
European Alliance for Innovation (EAI)
Publication year
2026
ISSN
2032-944X
ISSN
2032-944X
Language
English

Subjects

Explore related resources through these subjects.

Copied