Back to results
Bibliographic record · Consultation and access
Artículo

ANALYSIS OF TIME WASTE IN THE X WOVEN SARONG PRODUCTION PROCESS USING WASTE ASSESSMENT MODEL AT PT X

Laxmi Ratnaningsih et al · Universitas Trunojoyo Madura · 2025

Open-access full text
Quick overview. Review the resource’s basic details, then access the content using the main button. This page shows only the information needed to identify, cite, and open the work.

Resource access

Open the content from the main option or choose another available source.

DOAJ DOAJ Articles
Entrar por DOAJ
Main access

Open-access full text

Texto completo identificado como acceso abierto.
Open text

Summary

Descripción general del contenido del recurso.

PT X is a textile manufacturing company known as a prominent producer of woven sarongs. Among its various brands, the X sarong is the flagship product due to its high market value. Despite its large production scale, inefficiencies in the form of waste were detected within the production process. In this study, waste assessment model is applied to detect and categorize different kinds of inefficiencies or waste present in a process. The production flow is visualized using value stream mapping, and the value stream analysis tools are implemented to evaluate each process activity and identify its value added contribution. Root Cause Analysis (RCA) identifies the main causes of inefficiencies, and the 5W + 1H method is applied to formulate improvement strategies. WAM results indicate the highest to lowest waste percentages are: overproduction (22%), defects (20%), inventory (19%), transportation (15%), motion (13%), waiting (8%), and overprocessing (4%). Based on the proposed improvements, 14 non-value-added activities were eliminated, reducing total activities from 133 to 114 and cutting the process time by 139 minutes—from 3,853 to 3,714 minutes. Following the improvements, the Value Stream Mapping (VSM) analysis reveals a rise in Process Cycle Efficiency (PCE), improving from 67.5% to 70%, demonstrating a positive impact in minimizing waste and enhancing production efficiency.

How to cite

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

al, L. R. E. (2025). ANALYSIS OF TIME WASTE IN THE X WOVEN SARONG PRODUCTION PROCESS USING WASTE ASSESSMENT MODEL AT PT X. https://doi.org/10.21107/pamator.v18i3.30249

MLA

al, Laxmi Ratnaningsih et. "ANALYSIS OF TIME WASTE IN THE X WOVEN SARONG PRODUCTION PROCESS USING WASTE ASSESSMENT MODEL AT PT X." 2025. https://doi.org/10.21107/pamator.v18i3.30249.

Chicago

al, Laxmi Ratnaningsih et. 2025. "ANALYSIS OF TIME WASTE IN THE X WOVEN SARONG PRODUCTION PROCESS USING WASTE ASSESSMENT MODEL AT PT X.". https://doi.org/10.21107/pamator.v18i3.30249.

Harvard

al, L. R. E. 2025, ANALYSIS OF TIME WASTE IN THE X WOVEN SARONG PRODUCTION PROCESS USING WASTE ASSESSMENT MODEL AT PT X, Universitas Trunojoyo Madura, available at: https://doi.org/10.21107/pamator.v18i3.30249 [Accessed 7 Aug. 2026].

Share and print

Save the record, copy its permanent link, or print it as a PDF.

Export reference

You can export the record in common formats for use in a reference manager.

Resource details

Bibliographic information to help confirm that this is the correct material.

Title
ANALYSIS OF TIME WASTE IN THE X WOVEN SARONG PRODUCTION PROCESS USING WASTE ASSESSMENT MODEL AT PT X
Author / contributors
Laxmi Ratnaningsih et al
Publisher
Universitas Trunojoyo Madura
Publication year
2025
ISSN
1829-7935
ISSN
1829-7935
Language
English

Subjects

Explore related resources through these subjects.

Copied