Back to results
Bibliographic record · Consultation and access
Artículo

Advanced digital solutions for construction waste management: A 4D BIM integrated scenario analysis

Abdulwahed Fazeli et al · KeAi Communications Co., Ltd · 2026

Open access available
Quick overview. Review the resource’s basic details, then access the content using the main button. This page shows only the information needed to identify, cite, and open the work.

Resource access

Open the content from the main option or choose another available source.

DOAJ DOAJ Articles
Entrar por DOAJ
Main access

Open access available

Recurso identificado como acceso abierto, sin confirmar automáticamente si es texto completo directo.
Open resource

Summary

Descripción general del contenido del recurso.

Construction generates substantial material waste with environmental and economic impacts, yet current methods rarely integrate waste estimation with project schedules. This study develops and validates semi-automated 4D BIM framework that links element-level quantities to standardized resource specifications — CSI MasterFormat and the Iranian Cost Estimation Standard (ICES) — and propagates material-specific waste factors into a time-phased (Autodesk Navisworks Timeliner) analysis. Two custom applications (“Material-DB” and “Waste-Estimation”) import ICES items, map them to MasterFormat codes, compute waste by unit (area/volume/mass), and populate BIM parameters that are visualized over the construction programme. A municipal office project in Tehran (≈6800 m2, four floors) is used for validation. BIM-based estimates align with observed site waste within ≤17% deviation across key streams (e.g., concrete −7.6%, masonry −14.0%, tiles +8.0%, iron −16.7%), with concrete waste peaking early during foundations and primary envelopes. Five design/material scenarios demonstrate how the method supports fast scenario testing and cost appraisal; for example, Scenario 3 yields the lowest waste cost, whereas Scenarios 5 and 2 are highest. The framework enables schedule-aware waste planning, targeted design changes (e.g., exterior wall systems, stone/tile use), and routine waste audits, offering a replicable path towards time-cost-waste trade-off decisions in early project phases.

How to cite

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

al, A. F. E. (2026). Advanced digital solutions for construction waste management: A 4D BIM integrated scenario analysis. https://doi.org/10.1016/j.grets.2025.100318

MLA

al, Abdulwahed Fazeli et. "Advanced digital solutions for construction waste management: A 4D BIM integrated scenario analysis." 2026. https://doi.org/10.1016/j.grets.2025.100318.

Chicago

al, Abdulwahed Fazeli et. 2026. "Advanced digital solutions for construction waste management: A 4D BIM integrated scenario analysis.". https://doi.org/10.1016/j.grets.2025.100318.

Harvard

al, A. F. E. 2026, Advanced digital solutions for construction waste management: A 4D BIM integrated scenario analysis, KeAi Communications Co, Ltd, available at: https://doi.org/10.1016/j.grets.2025.100318 [Accessed 7 Aug. 2026].

Share and print

Save the record, copy its permanent link, or print it as a PDF.

Export reference

You can export the record in common formats for use in a reference manager.

Resource details

Bibliographic information to help confirm that this is the correct material.

Title
Advanced digital solutions for construction waste management: A 4D BIM integrated scenario analysis
Author / contributors
Abdulwahed Fazeli et al
Publisher
KeAi Communications Co., Ltd
Publication year
2026
ISSN
2949-7361
ISSN
2949-7361
Language
English

Subjects

Explore related resources through these subjects.

Copied