Back to results
Bibliographic record · Consultation and access
Artículo de revista

Application of vacuum preloading combining mixing pile method in treatment of tram foundation

ZHUANG Yan 1,3, WANG Xiao-dong 2, CHENG Jun 4 · Editorial Office of Chinese Journal of Geotechnical Engineering · 2017

Open access available
Quick overview. Review the resource’s basic details, then access the content using the main button. This page shows only the information needed to identify, cite, and open the work.
Serial publication

3D cross-hole resistivity inversion imaging of surrounding rock based on distance weighting constraint algorithm

This serial publication contains 241 related contents.

Resource access

Open the content from the main option or choose another available source.

DOAJ DOAJ Articles
Entrar por DOAJ
Main access

Open access available

Recurso identificado como acceso abierto, sin confirmar automáticamente si es texto completo directo.
Open resource

Summary

Descripción general del contenido del recurso.

Due to the green and environmental protection operation mode, the tram is leading the transportation industry into sustainable development in China. According to the structural characteristics and engineering properties of soft soil foundation in Nanjing, a vacuum preloading combining mixing pile foundation treatment method is proposed. Based on the monitoring results of surface settlement, layered settlement, horizontal displacement and pore pressure in construction period and cumulative settlement in operation period, the improvement effect of the proposed method as analyzed. It is shown that the pore water pressure gradually decreases with the increase of the depth. The horizontal displacement and layered settlement all decrease gradually during the process of vacuum. The total surface settlement remains unchanged after vacuum preloading of the soft soil foundation for 2 months, which means that the consolidation of soft soil is approximately completed. The total settlement at the surface of the subsoil is approximately 440 mm. The cumulative settlement after construction is 4.2 mm in half a year and approximately 9.8 mm in 10 years by the predicted method, which satisfies the requirements of the settlement control. It is concluded that the method of vacuum preloading combining mixing pile can significantly improve the tram soft soil foundation.

How to cite

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

ZHUANG Yan 1, 3. W. X. D. 2. C. J. 4. (2017). Application of vacuum preloading combining mixing pile method in treatment of tram foundation. https://doi.org/10.11779/CJGE2017S1033

MLA

ZHUANG Yan 1, 3, WANG Xiao-dong 2, CHENG Jun 4. "Application of vacuum preloading combining mixing pile method in treatment of tram foundation." 2017. https://doi.org/10.11779/CJGE2017S1033.

Chicago

ZHUANG Yan 1, 3, WANG Xiao-dong 2, CHENG Jun 4. 2017. "Application of vacuum preloading combining mixing pile method in treatment of tram foundation.". https://doi.org/10.11779/CJGE2017S1033.

Harvard

ZHUANG Yan 1, 3. W. X. D. 2. C. J. 4. 2017, Application of vacuum preloading combining mixing pile method in treatment of tram foundation, Editorial Office of Chinese Journal of Geotechnical Engineering, available at: https://doi.org/10.11779/CJGE2017S1033 [Accessed 8 Aug. 2026].

Share and print

Save the record, copy its permanent link, or print it as a PDF.

Export reference

You can export the record in common formats for use in a reference manager.

Resource details

Bibliographic information to help confirm that this is the correct material.

Title
Application of vacuum preloading combining mixing pile method in treatment of tram foundation
Author / contributors
ZHUANG Yan 1,3, WANG Xiao-dong 2, CHENG Jun 4
Publisher
Editorial Office of Chinese Journal of Geotechnical Engineering
Publication year
2017
ISSN
1000-4548
ISSN
1000-4548
Language
English

Subjects

Explore related resources through these subjects.

Copied