Back to results
Bibliographic record · Consultation and access
Artículo de revista

Application of real-time monitoring technology to foundation settlement of sloping breakwaters in construction

WANG Wei 1, XU Kai 1, WANG Hai-long 2, LI Lu-lu 2 · Editorial Office of Chinese Journal of Geotechnical Engineering · 2017

Open access available
Quick overview. Review the resource’s basic details, then access the content using the main button. This page shows only the information needed to identify, cite, and open the work.
Serial publication

3D cross-hole resistivity inversion imaging of surrounding rock based on distance weighting constraint algorithm

This serial publication contains 241 related contents.

Resource access

Open the content from the main option or choose another available source.

DOAJ DOAJ Articles
Entrar por DOAJ
Main access

Open access available

Recurso identificado como acceso abierto, sin confirmar automáticamente si es texto completo directo.
Open resource

Summary

Descripción general del contenido del recurso.

In recent years, China's port construction exhibits the development trend of large scale and deep water, and many ports are not the same type of seawall construction. Riprap construction of sloping breakwaters in open waters endures many complex factors from the external environment. Especially, coastal regions have distribution of deep and soft soil layers. With the increase in riprap amount and breakwater size, the real-time monitoring of settlement deformation is critical to control construction speed and project quality. According to the project situation and the characteristics of GPS technique, a real-time monitoring method for foundation settlement of sloping breakwater is proposed, including manufacture, laying and observation of subsidence monitoring equipments. The application of engineering example shows that the proposed method is suitable for the complex environment of riprap construction, and the settlement monitoring information can provide reliable basis for adjusting the intensity of riprap so as to ensure the safety of sloping breakwaters.

How to cite

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

WANG Wei 1, X. K. 1. W. H. L. 2. L. L. L. 2. (2017). Application of real-time monitoring technology to foundation settlement of sloping breakwaters in construction. https://doi.org/10.11779/CJGE2017S1017

MLA

WANG Wei 1, XU Kai 1, WANG Hai-long 2, LI Lu-lu 2. "Application of real-time monitoring technology to foundation settlement of sloping breakwaters in construction." 2017. https://doi.org/10.11779/CJGE2017S1017.

Chicago

WANG Wei 1, XU Kai 1, WANG Hai-long 2, LI Lu-lu 2. 2017. "Application of real-time monitoring technology to foundation settlement of sloping breakwaters in construction.". https://doi.org/10.11779/CJGE2017S1017.

Harvard

WANG Wei 1, X. K. 1. W. H. L. 2. L. L. L. 2. 2017, Application of real-time monitoring technology to foundation settlement of sloping breakwaters in construction, Editorial Office of Chinese Journal of Geotechnical Engineering, available at: https://doi.org/10.11779/CJGE2017S1017 [Accessed 9 Aug. 2026].

Share and print

Save the record, copy its permanent link, or print it as a PDF.

Export reference

You can export the record in common formats for use in a reference manager.

Resource details

Bibliographic information to help confirm that this is the correct material.

Title
Application of real-time monitoring technology to foundation settlement of sloping breakwaters in construction
Author / contributors
WANG Wei 1, XU Kai 1, WANG Hai-long 2, LI Lu-lu 2
Publisher
Editorial Office of Chinese Journal of Geotechnical Engineering
Publication year
2017
ISSN
1000-4548
ISSN
1000-4548
Language
English

Subjects

Explore related resources through these subjects.

Copied