Back analysis of construction of large deep excavations using intelligent optimization algorithm
ZUO Zi-bo 1, 2, HUANG Yu-lin 1, 2, WU Xiao-jian 1, 2 · Editorial Office of Chinese Journal of Geotechnical Engineering · 2017
3D cross-hole resistivity inversion imaging of surrounding rock based on distance weighting constraint algorithm
Resource access
Open the content from the main option or choose another available source.
Open access available
Summary
Descripción general del contenido del recurso.
How to cite
Elegí el formato que necesitás y copiá la referencia al portapapeles.
APA 7
ZUO Zi-bo 1, 2. H. Y. L. 1. 2. W. X. J. 1. 2. (2017). Back analysis of construction of large deep excavations using intelligent optimization algorithm. https://doi.org/10.11779/CJGE2017S2032
MLA
ZUO Zi-bo 1, 2, HUANG Yu-lin 1, 2, WU Xiao-jian 1, 2. "Back analysis of construction of large deep excavations using intelligent optimization algorithm." 2017. https://doi.org/10.11779/CJGE2017S2032.
Chicago
ZUO Zi-bo 1, 2, HUANG Yu-lin 1, 2, WU Xiao-jian 1, 2. 2017. "Back analysis of construction of large deep excavations using intelligent optimization algorithm.". https://doi.org/10.11779/CJGE2017S2032.
Harvard
ZUO Zi-bo 1, 2. H. Y. L. 1. 2. W. X. J. 1. 2. 2017, Back analysis of construction of large deep excavations using intelligent optimization algorithm, Editorial Office of Chinese Journal of Geotechnical Engineering, available at: https://doi.org/10.11779/CJGE2017S2032 [Accessed 7 Aug. 2026].
Resource details
Bibliographic information to help confirm that this is the correct material.
- Title
- Back analysis of construction of large deep excavations using intelligent optimization algorithm
- Author / contributors
- ZUO Zi-bo 1, 2, HUANG Yu-lin 1, 2, WU Xiao-jian 1, 2
- Publisher
- Editorial Office of Chinese Journal of Geotechnical Engineering
- Publication year
- 2017
- ISSN
- 1000-4548
- ISSN
- 1000-4548
- Language
- English
Subjects
Explore related resources through these subjects.