Back to results
Bibliographic record · Consultation and access
Artículo

An algorithm for minimising due times violations in flexible package production scheduling

Ibáñez, Francisco S. et al · SEDICI UNLP · 2003

Supplementary material available
Quick overview. Review the resource’s basic details, then access the content using the main button. This page shows only the information needed to identify, cite, and open the work.

Resource access

Open the content from the main option or choose another available source.

SEDICI UNLP SEDICI UNLP OAI-PMH
Entrar por SEDICI UNLP
Main access

Supplementary material available

El enlace apunta a material asociado, anexos, tablas, datos o página complementaria. No se marca como libro/texto completo.
Open material

Summary

Descripción general del contenido del recurso.

This paper includes part of the strategies used to solve a scheduling problem developed for a company that produces flexible packaging, presented in a quite general form though. In this problem it is necessary to schedule several jobs that involve four process and for each one of them there is a group of machines available (of similar characteristics). Each activity is performed on just one machine. Besides, for our application, the scheduling must try to verify certain conditions. For each process (and consequently for all the activities that perform this process) there is a list of attributes. The problem is not only to assign each activity to a starting time and to a specific machine, but also to try to verify conditions that depend on the values of the attributes of the activities. Moreover, there are criteria to choose a particular machine. An approach to solve this problem was presented first in [1]. As mentioned there, some due dates could not be fulfilled on time. An approach to decrease the quantity of due dates violations was presented in [2 . This approach generates acceptable results for most of the cases in the real application. However, there were some cases in which the Algorithm did not work properly. The present work includes an Algorithm that improves the results generated in [2 ]for some special cases that arose in the real application. Facultad de Informática

How to cite

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

Ibáñez, F. S. E. A. (2003). An algorithm for minimising due times violations in flexible package production scheduling. http://sedici.unlp.edu.ar/handle/10915/9464

MLA

Ibáñez, Francisco S. et al. "An algorithm for minimising due times violations in flexible package production scheduling." 2003. http://sedici.unlp.edu.ar/handle/10915/9464.

Chicago

Ibáñez, Francisco S. et al. 2003. "An algorithm for minimising due times violations in flexible package production scheduling.". http://sedici.unlp.edu.ar/handle/10915/9464.

Harvard

Ibáñez, F. S. E. A. 2003, An algorithm for minimising due times violations in flexible package production scheduling, SEDICI UNLP, available at: http://sedici.unlp.edu.ar/handle/10915/9464 [Accessed 7 Aug. 2026].

Share and print

Save the record, copy its permanent link, or print it as a PDF.

Export reference

You can export the record in common formats for use in a reference manager.

Resource details

Bibliographic information to help confirm that this is the correct material.

Title
An algorithm for minimising due times violations in flexible package production scheduling
Author / contributors
Ibáñez, Francisco S. et al
Publisher
SEDICI UNLP
Publication year
2003
Language
English

Subjects

Explore related resources through these subjects.

Copied