Back to results
Bibliographic record · Consultation and access
Artículo

Fast Estimation of Loader’s Shovel Load Volume by 3D Reconstruction of Material Piles

Binyun Wu et al · KeAi Communications Co., Ltd · 2023

Open access available
Quick overview. Review the resource’s basic details, then access the content using the main button. This page shows only the information needed to identify, cite, and open the work.

Resource access

Open the content from the main option or choose another available source.

DOAJ DOAJ Articles
Entrar por DOAJ
Main access

Open access available

Recurso identificado como acceso abierto, sin confirmar automáticamente si es texto completo directo.
Open resource

Summary

Descripción general del contenido del recurso.

Abstract Fast and accurate measurement of the volume of earthmoving materials is of great significance for the real-time evaluation of loader operation efficiency and the realization of autonomous operation. Existing methods for volume measurement, such as total station-based methods, cannot measure the volume in real time, while the bucket-based method also has the disadvantage of poor universality. In this study, a fast estimation method for a loader’s shovel load volume by 3D reconstruction of material piles is proposed. First, a dense stereo matching method (QORB–MAPM) was proposed by integrating the improved quadtree ORB algorithm (QORB) and the maximum a posteriori probability model (MAPM), which achieves fast matching of feature points and dense 3D reconstruction of material piles. Second, the 3D point cloud model of the material piles before and after shoveling was registered and segmented to obtain the 3D point cloud model of the shoveling area, and the Alpha-shape algorithm of Delaunay triangulation was used to estimate the volume of the 3D point cloud model. Finally, a shovel loading volume measurement experiment was conducted under loose-soil working conditions. The results show that the shovel loading volume estimation method (QORB–MAPM VE) proposed in this study has higher estimation accuracy and less calculation time in volume estimation and bucket fill factor estimation, and it has significant theoretical research and engineering application value.

How to cite

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

al, B. W. E. (2023). Fast Estimation of Loader’s Shovel Load Volume by 3D Reconstruction of Material Piles. https://doi.org/10.1186/s10033-023-00945-y

MLA

al, Binyun Wu et. "Fast Estimation of Loader’s Shovel Load Volume by 3D Reconstruction of Material Piles." 2023. https://doi.org/10.1186/s10033-023-00945-y.

Chicago

al, Binyun Wu et. 2023. "Fast Estimation of Loader’s Shovel Load Volume by 3D Reconstruction of Material Piles.". https://doi.org/10.1186/s10033-023-00945-y.

Harvard

al, B. W. E. 2023, Fast Estimation of Loader’s Shovel Load Volume by 3D Reconstruction of Material Piles, KeAi Communications Co, Ltd, available at: https://doi.org/10.1186/s10033-023-00945-y [Accessed 9 Aug. 2026].

Share and print

Save the record, copy its permanent link, or print it as a PDF.

Export reference

You can export the record in common formats for use in a reference manager.

Resource details

Bibliographic information to help confirm that this is the correct material.

Title
Fast Estimation of Loader’s Shovel Load Volume by 3D Reconstruction of Material Piles
Author / contributors
Binyun Wu et al
Publisher
KeAi Communications Co., Ltd
Publication year
2023
ISSN
2192-8258
ISSN
2192-8258
Language
English

Subjects

Explore related resources through these subjects.

Copied