Back to results
Bibliographic record · Consultation and access
Document

A weight-based algorithm to deal with due dates in flexible package production scheduling

Ibáñez, Francisco S. et al · SEDICI UNLP · 2004

Open-access full text
Quick overview. Review the resource’s basic details, then access the content using the main button. This page shows only the information needed to identify, cite, and open the work.

Resource access

Open the content from the main option or choose another available source.

SEDICI UNLP SEDICI UNLP OAI-PMH
Entrar por SEDICI UNLP
Main access

Open-access full text

Texto completo identificado como acceso abierto.
Open text

Summary

Descripción general del contenido del recurso.

This paper is an extension of a previous paper published in [2]. In this problem it is necessary to schedule several jobs that involve four process and for each one of them there is a group of machines available (of similar characteristics). Each activity is performed on just one machine. Besides, for our application, the scheduling must try to verify certain conditions. For each process (and consequently for all the activities that perform this process) there is a list of attributes. The problem is not only to assign each activity to a starting time and to a specific machine, but also to try to verify conditions that depend on the values of the attributes of the activities. Moreover, there are criteria to choose a particular machine An approach to solve this problem was presented first in [1]. As mentioned there, some due dates could not be fulfilled on time. An approach to decrease the quantity of due dates violations was presented in [2]. Roughly speaking, the algorithm presented in [1] is entirely dedicated to verify as many conditions as possible disregarding due dates violations. By the other hand, the algorithm shown in [2] was focussed to reduce the numer of due dates violations paying the price of decreasing the fulfillment of conditions. Roughl speaking, the first approach favour the company whereas the second one is more convenient for the customers. The present work includes an algorithm which allows to assign weights to set an appropriate trade-off between due date violations reduction and fulfillment of conditions Eje: V - Workshop de agentes y sistemas inteligentes Red de Universidades con Carreras en Informática (RedUNCI)

How to cite

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

Ibáñez, F. S. E. A. (2004). A weight-based algorithm to deal with due dates in flexible package production scheduling. SEDICI UNLP. http://sedici.unlp.edu.ar/handle/10915/22545

MLA

Ibáñez, Francisco S. et al. A weight-based algorithm to deal with due dates in flexible package production scheduling. SEDICI UNLP, 2004. http://sedici.unlp.edu.ar/handle/10915/22545.

Chicago

Ibáñez, Francisco S. et al. 2004. A weight-based algorithm to deal with due dates in flexible package production scheduling. SEDICI UNLP. http://sedici.unlp.edu.ar/handle/10915/22545.

Harvard

Ibáñez, F. S. E. A. 2004, A weight-based algorithm to deal with due dates in flexible package production scheduling, SEDICI UNLP, available at: http://sedici.unlp.edu.ar/handle/10915/22545 [Accessed 5 Aug. 2026].

Share and print

Save the record, copy its permanent link, or print it as a PDF.

Export reference

You can export the record in common formats for use in a reference manager.

Resource details

Bibliographic information to help confirm that this is the correct material.

Title
A weight-based algorithm to deal with due dates in flexible package production scheduling
Author / contributors
Ibáñez, Francisco S. et al
Publisher
SEDICI UNLP
Publication year
2004
Language
English

Subjects

Explore related resources through these subjects.

Copied