Back to results
Bibliographic record · Consultation and access
Artículo

Scheduling the production of prefabrication construction supply chains considering variable delivery times

Chung Ho et al · Vilnius Gediminas Technical University · 2026

Open-access full text
Quick overview. Review the resource’s basic details, then access the content using the main button. This page shows only the information needed to identify, cite, and open the work.

Resource access

Open the content from the main option or choose another available source.

DOAJ DOAJ Articles
Entrar por DOAJ
Main access

Open-access full text

Texto completo identificado como acceso abierto.
Open text

Summary

Descripción general del contenido del recurso.

The application of prefabrication and modularization in the construction industry has grown significantly recently. The efficiency of prefabrication supply chains yields substantial advantages for construction projects. A challenge is the variability in delivery times, which negatively impacts the economy and reliability of prefabrication supply chains. Most construction prefabrication suppliers have difficulty adjusting their schedules in response to delivery time changes in a timely manner. Despite this critical challenge, limited research has addressed proactive and robust production scheduling to mitigate these uncertainties. This study investigates a method for proactive and robust production scheduling for construction prefabrication suppliers, particularly those with multiple fabrication shops, responding to changes in delivery times. This paper introduces a multi-objective, two-stage stochastic programming model that facilitates the production planning with multiple fabrication shops, considering variable delivery times. Computational results from an experimental study demonstrate that the proposed optimization model achieves a 14.6% cost reduction compared to the traditional EDD method. Computational results also show that the expected cost of the stochastic programming model achieves a cost reduction of 0.23% compared to a deterministic model. These findings suggest the model’s capability to generate robust and flexible schedules that effectively balance cost minimization with time reduction.

How to cite

Elegí el formato que necesitás y copiá la referencia al portapapeles.

APA 7

al, C. H. E. (2026). Scheduling the production of prefabrication construction supply chains considering variable delivery times. https://doi.org/10.3846/jcem.2026.26156

MLA

al, Chung Ho et. "Scheduling the production of prefabrication construction supply chains considering variable delivery times." 2026. https://doi.org/10.3846/jcem.2026.26156.

Chicago

al, Chung Ho et. 2026. "Scheduling the production of prefabrication construction supply chains considering variable delivery times.". https://doi.org/10.3846/jcem.2026.26156.

Harvard

al, C. H. E. 2026, Scheduling the production of prefabrication construction supply chains considering variable delivery times, Vilnius Gediminas Technical University, available at: https://doi.org/10.3846/jcem.2026.26156 [Accessed 7 Aug. 2026].

Share and print

Save the record, copy its permanent link, or print it as a PDF.

Export reference

You can export the record in common formats for use in a reference manager.

Resource details

Bibliographic information to help confirm that this is the correct material.

Title
Scheduling the production of prefabrication construction supply chains considering variable delivery times
Author / contributors
Chung Ho et al
Publisher
Vilnius Gediminas Technical University
Publication year
2026
ISSN
1392-3730
ISSN
1392-3730
Language
English

Subjects

Explore related resources through these subjects.

Copied